Blaine, MN
Blaine, MN
Blaine, MN
2401 121st Cir Ne # H, Blaine
furnace and air conditioner replacement
2401 121st Cir Ne # F, Blaine
ADD RETURN TO LOWER LEVEL WALL AND INSTALL HUMIDIFIER.
2401 121st Cir Ne # D, Blaine
The 6 x 18 deck all we are doing is replacing the deck boards for the stairs. The landing structure is staying the same by the door the stringers and the header of the stairs are being rebuilt. Stringers are 16 inches on center with 2 x 6 decking stringers are 2 x 12.
2401 121st Cir Ne # C, Blaine
The 6 x 18 deck all we are doing is replacing the deck boards for the stairs. The landing structure is staying the same by the door the stringers and the header of the stairs are being rebuilt. Stringers are 16 inches on center with 2 x 6 decking stringers are 2 x 12.
2401 121st Cir Ne # E, Blaine
The 6 x 18 deck all we are doing is replacing the deck boards for the stairs. The landing structure is staying the same by the door the stringers and the header of the stairs are being rebuilt. Stringers are 16 inches on center with 2 x 6 decking stringers are 2 x 12.
2401 121st Cir Ne # A, Blaine
We are tearing off the old deck and stair boards, removing the nails, and installing new cedar-tone-treated 2x6 deck boards. We are staggering the deck boards and screwing them down with a 3" screw.
2401 121st Cir Ne # F, Blaine
We are tearing off the old deck and stair boards, removing the nails, and installing new cedar-tone-treated 2x6 deck boards. We are staggering the deck boards and screwing them down with a 3" screw.
2401 121st Cir Ne # G, Blaine
We are tearing off the old deck and stair boards, removing the nails, and installing new cedar-tone-treated 2x6 deck boards. We are staggering the deck boards and screwing them down with a 3" screw.
2401 121st Cir Ne # L, Blaine
We are tearing off the old deck and stair boards, removing the nails, and installing new cedar-tone-treated 2x6 deck boards. We are staggering the deck boards and screwing them down with a 3" screw.
2401 121st Cir Ne # B, Blaine
The 6 x 18 deck all we are doing is replacing the deck boards for the stairs. The landing structure is staying the same by the door the stringers and the header of the stairs are being rebuilt. Stringers are 16 inches on center with 2 x 6 decking stringers are 2 x 12.
2401 121st Cir Ne # H, Blaine
The 6 x 18 deck all we are doing is replacing the deck boards for the stairs. The landing structure is staying the same by the door the stringers and the header of the stairs are being rebuilt. Stringers are 16 inches on center with 2 x 6 decking stringers are 2 x 12.
2401 121st Cir Ne # I, Blaine
The 6 x 18 deck all we are doing is replacing the deck boards for the stairs. The landing structure is staying the same by the door the stringers and the header of the stairs are being rebuilt. Stringers are 16 inches on center with 2 x 6 decking stringers are 2 x 12.
2401 121st Cir Ne # J, Blaine
The 6 x 18 deck all we are doing is replacing the deck boards for the stairs. The landing structure is staying the same by the door the stringers and the header of the stairs are being rebuilt. Stringers are 16 inches on center with 2 x 6 decking stringers are 2 x 12.
2401 121st Cir Ne # K, Blaine
The 6 x 18 deck all we are doing is replacing the deck boards for the stairs. The landing structure is staying the same by the door the stringers and the header of the stairs are being rebuilt. Stringers are 16 inches on center with 2 x 6 decking stringers are 2 x 12.
2401 121st Cir Ne # B, Blaine
INSTALL/ REPLACE TEMPSTAR FURNACE AND AIR CONDITIONER
2401 121st Cir Ne # F, Blaine
REPLACE AC
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.