Saint Paul, MN
Saint Paul, MN
39
11
$116,201
add 10 circuits
Install (1) Thermolec FER-10-10 mini make up air unit with ductwork through roof Suite 2118C
2/23/2026: CONTRACTOR REQUESTED PERMIT CANCELAITON AND REFUND. PROJECT CANCELED. BM *PERMIT HAS BEEN WITHDRAWN PER APPLICANT GRAHAM TEAL. PLEASE SEE ATTACHMENTS FOR CONFIRMATION EMAIL OF WITHDRAWL. Proposed tenant will occupy the existing suite as-is for use as a logistics business office. No construction, reconfiguration, or modifications to the building systems are proposed. This project is solely a change of occupancy from the previously permitted F-1/S-1 use to B-Business (office) use. This business will be Lifted Logistics a transportation logistics company for a cannabis company regulated by the OCM. While it is connected to a cannabis company, no actual cannabis will be on site.
Suite 607 Replace existing Trane 100,000 BTUH 92% efficient furnace
Replace unit heater with furnace and replace unit heater with unit heater
Replace existing Trane 4-ton condensing unit and evaporator coil with Carrier 4-ton condensing unit model 24SCA448 R-410A
Replace existing Trane 100,000 BTUH 92% furnace
Install new horizontal furnace. Install new supply/return air ductwork tying into new furnace and existing furnace. Install fresh air ductwork to both furnaces
Alterations/Upgrade
Adding partition walls to create new room with door. Change of use from warehouse to Cannabis Cultivation Grow Facility.
Install fresh air ductwork tying into existing furnace. Install supply/return air ductwork tying into existing furnace
STOOP REMOVAL AND INSTALL CONCRETE ADA RAMP AND STEP
HPC. TUCKPOINTING IN AREAS WITH DETERIORATING BRICK AND REPLACING OF SOME BRICK WHERE TUCKPOINTING ISN'T FEASIBLE DUE TO MAJOR FAILURE, ALSO REPLACING A LINTEL ABOVE WINDOW AND BRICK WILL MATCH EXISTING.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.