electrical · roofing
electrical · plumbing
BLDG - Residential - Deck Only · Blaine · Permit B26-01152
Build new 12'x18' deck with stairs to grade, 4' height. Framing 2x10 spaced 16" oc, 6x6 posts on Helical footings. TimberTech Prime+ decking with Kadenz Railing.
BLDG - Residential - Deck Only · Blaine · Permit B26-00999
Re-surface with new stair framing. Existing deck framing and footings will remain. Remove decking and railing. Install joist tape to existing framing. Install 6 new 2x12 stair stringers. Install new Trex composite decking and Kadenz aluminum railing.
Deck · Lino Lakes · Permit P2026-0451
Building · Maple Grove · Permit MG419107
New, Install new deck, helical footings, 6x6 w 2x10 framing, Trex decking, Westbury rail
BLDG - Residential - Deck Only · Blaine · Permit B26-00911
Install new L shape deck/stoup off back patio door. 3'x9' connected to 3'x6' deck. Stairs to grade, 24" off grade. 2x10 framing, triple 2x10 beam. with H-frame to connect the 2. Trex basics decking, diamond pier footings. Grippable handrail for stair.
Deck · New Brighton · Permit PBR26-0065
Building · Savage · Permit SA039431
Replacement
Roofing · New Brighton · Permit PB26-0032
Building · Crystal · Permit CY092544
Remove/Install, Siding
BLDG - Residential - Deck Only · Blaine · Permit B26-00076
Install waterproofed and flashed ledger board. Install Helical Pile footings and 6x6 posts. Build new 21x12 deck with 4x4 landing and stairs to grade with 2x10 Kiln Dried (KDAT) framing 16" O.C. Install Trex Rain Escape membrane for future dry space below deck (ceiling and gutters not included). Install TimberTech Terrain+ Composite Decking (DARK OAK) with hidden fastener system and with picture frame (DARK OAK) finish with cortex screws and plugs. Install PVC fascia, risers, and post wraps painted to match house trim. Install Westbury Tuscany railing (BLACK).
Deck · New Brighton · Permit PBR26-0035
Residential Building Remodel by Licensed Contractor · Saint Paul · Permit DSIBLDRC-025811-2026
Replacing old deck with new 10'x10' deck, 24" off grade. New Ledger with water barrier behind. New Helical footings. 2x10 KDAT lumber, joist spaced 16" OC, 6x6 posts. New stairs to grade. Trex composite decking. No railing needed
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.