$95,187
electrical work furnace reset
electrical work furnace reset
Installing a new furnace
Adding a bedroom to unfinished space in basement. Attachment shows new room layout. Second sheet shows the electrical wiring for a 20 amp circuit with 12 gage wiring. The house doesn't have hard-wired smoke alarms. So hardwired smoke alarm is connected to a new CO2 detector in the hallway. Page 3 shows an existing 3-way light switch and socket are being moved to the hallway.
Installing new furnace
INSTALL LOWER LEVEL BASE DUCTWORK. ADD ADDITIONAL RETURN TO EXISTING TRUNK
Adding a bedroom to unfinished space in basement. Hatch marks on attached PDF show new room. There is a wall labeled "Existing Frame Wall" that I'll just move back to location shown. In-floor HVAC supply air is already present. Will add a cold air return. The dual casement window to outside is also present. Both windows are 26"W X 43"H. Actual opening size for each is 22"W X 43"H. Height from poured floor to window sill is 31". Planning on a drop-in ceiling. The Exterior wall (South) is at grade. Framing insulation and vapor barrier is present. Wall (East) shared with Recreation Room will be dry walled on both sides with fiber glass insulation. North wall (north) will be dry-walled both sides. West wall is dry-walled on room side only. Second sheet shows the electrical wiring for a 20 amp circuit with 12 gage wiring. The house doesn't have hard-wired smoke alarms. So hardwired smoke alarm is connected to a new CO2 detector in the hallway. Page 3 shows an existing 3-way l
RO installs. D&R vinyl, panflash, tape, Drip, new J. Leave existing new jambs and casing in place(it's separate from the window & window jamb. Install new window, spray foam and add new unfinished jamb between the window and the existing jamb, add paintable silicone. Home owner will paint all trim
WE ARE REMOVING LOWER LEVEL BEDROOM WINDOW AND LOWER LEVEL PATIO DOOR TO ROUGH OPENING AND REPLACING WITH PELLA LIFESTYLE SERIES
Tear off and re-roof 20 sq asphalt shingles
BATHROOM REMODEL: REPLACE TOILET, REPLACE VANITY, RUN NEW WATER LINES FOR NEW SHOWER, RELOCATE DRAIN FOR NEW SHOWER
Master Bathroom Remodel
Remodeling bathroom (shower, sink, flooring, etc.) also has three windows on site being replaced. | Other
WATER HEATER - SERV2503179 MAYA PARKASH
Full reroof down to wood substrate installing new GAF HDZ shingles
Installing new ac
electrical ac reset
Install dryer vent
Family room remodel wire to code
Basement update | Basement Finish
Plumbing work for laundry remodel on lower level
Install 5 new Full Frame replacement windows in Dwelling
wATER HEATER REPLACEMENT
Laundry remodel wire to code main floor bath remodel wire to code co/smokes per building code
Install (4) RbyA Acclaim FF replacement windows; (2) triple casements, (1) double casement & (1) circle top. Windows will be installed into existing openings & the existing opening size will not be altered.