Rochester, MN
Rochester, MN
381
1
$2,000
2
REPLACE WATER HEATER - HANINE S3114
WATER HEATER REPLACEMENT
REROOFING; 24 SQ | Other
Add 6 recess, ceiling fan, tv outlet Change breaker to AFCI, outlet to be GFCI protected
22' X 15' deck with roof, no walls. | Porch Addition
furnace
Wiring for basic furnace replacement
ac
REPLACE AC
AC replacement
AC for B&C
Water heater replacement - 40 gal short atmospheric vent natural gas water heater
Wire Furnace and AC
Replace Furnace and AC
Remove 100A, relocate. Change to 200A. Wire 115A 240v circuit to new paint booth. Wire 20A 115V circuit to new booth lights.
Structural modification to existing roof trusses to allow for HVAC installation.
All 18 ga duct and caps will be provided with the booth, installation to be completed by Tonna Mechanical Roof curb or cone flashings will be provided, spotted, and installed by Tonna Mechanical This includes 2 duct @ 34”dia, and 1 duct @10”dia – exhausts to be 6’ above roof All duct to be fire-wrapped and banded in the truss space, to extend 6” above roof line. Duct will be supported/suspended to relieve equipment of all duct load Cable tie offs will be provided as necessary for 6’ of exhaust duct above roof Existing exhaust duct penetration through side wall will be insulated capped on the inside of the building, exterior weather-hood to remain.
Furnace and AC Replacement
Furnace and AC Reconnect
Reconnecting existing gas piping to a new meter set
Roof Mounted PV Solar Installation; 12 Panels | Other
Add kitchen outlets, undercabinet lights & sink light
Roof Mounted PV Solar Installation; 12 Panels
Remove the existing supply duct in the kitchen. Patch ductwork. Add a 6 inch supply to kitchen and run it under the new kitchen cabinets
Retaining Wall
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.