Minneapolis, MN
Minneapolis, MN
216
3
$13,000
Approval of these plans shall not be construed as permitting a violation of the building codes or any other laws or ordinances. PTAC units condensate shall be piped and discharged into condensate riser as specified. Will provide Bard or equal unit
Installing 6 supply diffuser and 6 return grille. Refer to attached drawings.
R&R Roof, includes Install of 1/2" OSB over existing decking on entire roof.
reconfigure three offices in office suite 500. certificate of occupancy required: no const type: 1a occupancy: b 2020 MSBC sprinklered: yes architect: hustad
Remove Existing Asphalt Shingles. Install New Ice & Water at Eves and Valleys & Reinforced Felt Underlayment at Balance of Roof. Install New Drip edge & Asphalt Shingles. Includes Vents and Ridges.
installing a one head ductless system
FURR OUT 3 PERIMETER BASEMENT WALLS AND INSTALL GYP BD FINISH AT WALLS AND CEILING FOR NEW 10'x20' FAMILY ROOM AT HALF OF BASEMENT, NO WORK AT EXISTING BATHROOM, EXISTING WINDOWS TO REMAIN. Building Code: 2020 MN RESIDENTIAL CODE/MN RULES CH 1309 (201
NEW 6 STORY APARTMENT BUILDING - BUILDING C
Complete Inside Plumbing, Including set all Fixtures
CONSTRUCT 6 STORY APARTMENT BUILDING WITH BASEMENT LEVEL PARKING. 143 units total. F&F issued under separate permit 8 type A units provided all remaining units are type B. certificate of occupancy required: yes CONST TYPE: 3a OVER 1a PODIUM NUMBE
Footing and foundation for future 6-story apartment building under BLDG915457 Applicant's assumed excavation, extending into the ROW, requires additional permitting by Public Works certificate of occupancy required: no CONST TYPE: I-A NUMBER OF STOR
STRUCTURAL CONCRETE PERMIT UP TO LEVEL 3. FOOTING AND FOUNDATION WALLS APPROVED UNDER PERMIT BDLD912849. THERE ARE 3 BUILDINGS ON SITE. THIS STRUCTURAL PERMIT IS FOR BUILDING B ONLY AND DOES NOT INCLUDE ANY ARCHITECTURAL REVIEW. (JJL) SPECIAL INSPECT
EXCAVATION AND FOOTING AND FOUNDATIONS PERMIT. THERE ARE 3 BUILDINGS ON SITE. THIS PERMIT IS FOR BUILDING B (7 STORIES). WORK FOR THIS PERMIT INCLUDES FOOTINGS AND BASEMENT WALLS ONLY. FIRST FLOOR FRAMING, INCLUDING SLAB AT LEVEL 1 NOT INCLUDED. SPEC
The scope of the project includes the installation of a plumbing system for a bar to be housed within a cargo shipping container.
REPLACE-IN-KIND SMALL-AREA FACADE STONE MASONRY AT GRADE ----- PROTECTION OF PEDESTRIANS SHALL COMPLY WITH 2020 MSBC 3306 INCLUDING BARRIERS AND COVERED WALKWAYS PER TABLE 3306.1 ----- SEPERATE RIGHT OF WAY (ROWAY) PERMIT REQUIRED FOR PROTECTION/OBST
(DMH - ProjectDox) BATHROOM REMODEL IN SFD. DEMO EXISTING FIXTURES AND FINISHES. REPLACE BATHROOM FIXTURES WITH NEW IN SAME LOCATION. INSTALL INSULATION AND VAPOR BARRIER AT EXTERIOR WALL CONDITIONS. INSTALL CEMENT BACKER BOARD FOR CERAMIC TILE SURFAC
Bathroom exhaust with existing fan. Add/Relocate diffusers in office.
Install fixtures for 2nd floor 3/4 bathroom.
Replacing 2 existing bath fans, ducting is existing.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.