Installation of condensate piping for HVAC units per design. Reviewed under canceled permit BLDG1153582
Modify gas rough in per plumbing inspector. Connect new stove. Mike Brinda has reviewed current site conditions. All gas piping and appliances shall be installed in accordance with the 2020 Minnesota State Fuel Gas Code Code (MSFGC). Approv
remodel 190 units fixtures and waste stacks All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Code (MSPC), Chapter 4714. All pipe, pipe fittings, traps, fixtures, material, and devices used in the plumbing system
HVAC system, wide infrastructure upgrades, includes new boilers, pumps, air handlers, VAV boxes, self-contained heating & cooling units, split systems, GRD's and duct works per approved plans.
Remodel of residential units and common spaces. Electrical feeder replacement, waste piping replacement and finish upgrades (cabinets, countertops, plumbing/electrical fixtures) certificate of occupancy required: no SPECIAL INSPECTIONS REQUIRED FOR