Rochester, MN
Rochester, MN
404
6
$10,700
Footing and foundation only for: Single family dwelling with finished basement and attached three-car garage
Underground plumbing
Electrical for furnace replacement (2015 NEC Applies)
Addition of a 16x16 deck. Back of the house. | Deck Addition
REPLACE FURNACE
Electrical - reconfigure electrical for grocery pickup
WIRING REPLACEMENT FURNACE AND GAS BOND
REPLACEMENT FURNACE AND GAS BOND
Remove and Replace two water heaters - Center 2 units. 120G NG 400,000BTU PV
REPAIR BROKEN UNDERGROUND SERVICE WIRE
40G ATMO WATER HEATER INSTALLATION
Add outlet for water softener
Basement system | Other
2020 Target Miscellaneous Projects Door Replacement: install dock door safety locks
Wall sign "Wine and Spirits" for Target North [lit]
Electrical - install 11.52 (DC) grid tied residential PV solar system Installing flush roof-mounted 11.52 kW (DC) PV solar system
WIRING REPLACEMENT AC
REPLACEMENT AC
Installing flush roof-mounted 11.52 kW (DC) PV solar system | Other
per plan review, add 2 washer, dryer circuits, move some lights around, demo, move a switch
Rewire after garage was reframed.
>Main Floor 2-Washing Machine Hook-ups 1-Code Complaint Floor Drain 1-Flush Rim Sink with Spray Down Faucet 1-Hand Washing Sink >Second Floor Laundry Room 1-Flush Rim Sink with Spray Down Faucet
2-Dryers vents 1-Transfer grill for room 201
Remodeling of staff area to expand the memory care area on the 2nd floor. Add main entry door with security features on 1st floor. (The Waters on Mayowood)
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.