Minneapolis, MN
Minneapolis, MN
52
10
$2,117,392
Replace the current rooftop unit #4 Review Note: Unless technically unfeasible, new and replacement rooftop equipment shall be provided with insulated curbs as described in the 2024 Minnesota Energy Code Sections 5.5.3.1and 6.1.1.3.6 - which states
Replace (3) existing AHU's with two #16 AHU's and one #30 AHU with steam and condensate piping and chilled-water piping to serve the Holden Center and construction labs.
Ductwork modifications per approved plan.
Install a single compartment sink and faucet. Install a wall water supply box.
remodel engineering faculty offices. certificate of occupancy required: no sprinklered: yes architect: berg #26948 Clow Berg architects
20-ton dual-circuit condenser
/Furnish and install two mini-split units
10 TON REPLACEMENT AHU+PIPING BTWN RTU & COIL Review Note: Unless technically unfeasible, new and replacement rooftop equipment shall be provided with insulated curbs as described in the 2024 Minnesota Energy Code Sections 5.5.3.1and 6.1.1.3.6 - w
REMODEL - REMOVE BLOCK, ADD DRYWALL - DUNWOODY, GREEN LEVEL 2020 MSBC architect: 26978 - Berg, Michael Erik
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.