Rochester, MN
Rochester, MN
326
3
$113,700
2
Plumbing per submitted plans - Bowlocity Addition (C2025)
Gas piping per submitted plans - Bowlocity Addition (C2025)
Expanding and remodeling the Bowlocity building.
Make 2 bathrooms into 1 for handicap accommodation. Remove 2 toilets 2 lavs 1 tub 1 shower. Relocate 1 toilet, 1 lav and 1 shower.
ADA bathroom remodel and stair lift receptacle install.
Install new lighting in suite. Install 30 amp 240 volt line for laundry hookup. Add new light and switch in back room.
REINSTALL 6 LIGHTS AND 2 RECEPTACLES AFTER NEW SIDING WAS INSTALLED WINKELS JOB #2335705
Second floor bathroom remodel | Other
Installation of (2) added quad receptacles served by (4) new 120-Volt circuits by the kitchen serving window. Please use PO#949736-24091328
Footing and Foundation permit only for Bowlocity Addition
7'x10' room residing within a salon for service privacy.
Installing a new bathroom exhaust fan as part of a new basement bathroom addition.
Wire AC
Replace AC
CAPACITOR INSTALL PLEASE USE PO#949399-24080852
NE - BB ID 957-442-767 - Bowlocity Additions
Bethel Lutheran Church Accordion Wall Infill. Scope is to remove the accordion doors and infill with metal studs and drywall. Adding in 2 duplex outlets in each of the six offices for a total of 12. Outlets are to be tied into the nearest circuit.
Electrical work for adding in 2 duplex outlets in each of the six offices for a total of 12. Outlets are to be tied into the nearest circuit. Egan foreman: Paul Bedney 507-259-5518 Egan Job# 612470-910
Replace one window in the SE basement in existing opening. Window measurements are included in the spec sheet. In an existing opening replacing a window with an Egress Window. Framing-member size around the window/treated: Overall Frame Size: 28 X 45 1/2 green treated buck Manufacturer's information on the egress size: Rough Opening: 28 1/4 X 45 3/4 Height of the well must be verified to determine ladder requirements: Galvanized 50x48 egress well Verify height of window opening from finished floor, maximum 44": Height is 44" from the floor or less. Verify that it meets the minimum 9 square feet requirement for window well: Yes, 55" wide, 48" tall and 36" projection. 3' clearance verified in any direction inside of the window well: Yes Drainage system information for the window well (minimum 12" gravel): drainage is pea gravel with the minimum of 12". Information on ladder: 3 step egress ladder will be fastened to well. Basement considered habitable space: Yes Verify the existing house
REPLACE FURNACE & AC
LOWER LEVEL BATHROOM ADDITION IN UNFINISHED BASEMENT.
LOWER LEVEL BATHROOM ADDITION IN UNFINISHED BASEMENT.
LOWER-LEVEL BATHROOM ADDITION IN UNFINISHED BASEMENT. | Basement Finish
Rehook new AC installed by B&C 5/22/24
Replace failed AC
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.