Minneapolis, MN
Minneapolis, MN
272
1
1
Remove and replace the furnace and AC
INSTALL 5.28 kW FLUSH ROOF-MOUNT SOLAR PV SYSTEM AT 2 SOUTH FACING ROOF SECTIONS OF TFD. EXISTING ROOF FRAMING EVALUATION BY STRUCTURAL ENGINEER: ROBERT SMYTHE #57646 (RIGHT ANGLE ENGINEERING) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOT
Bathroom Remodel w/ New Window Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. Safety glazing is required in walls c
Tear off and reroof house upper level elevations only. Not for flat roof or lower back right.
Reroof House only
Tear off and replace a shingled roofing system.
FIRE DAMAGE (9/2020) REHAB AT 2.5 STORY SFD - APPLICANT TO PROVIDE STRUCTURAL ENGINEERS DESIGN AND LETTER TO BE AVAILABLE TO BUILDING INSPECTOR AT TIME OF INSPECTION, AND SUBMIT SAME TO INSPECTION DEPT. UPON COMPLETION OF WORK. ALTER EXISTING ROOF STRUC
Rear addition (south elevation) Apply 2 layers grade D paper, 3.4 self furring lath, necessary flashing and accessories.Apply Portland based Stucco system. Front of house (north upper elevation): Remove damaged stucco patch, repair as necessary with DD pa
DUCTLESS MINI SPLIT WITH 5 WALL HEADS
DUCTLESS MINI SPLIT - 2 WALL HEADS
install replacement furnace & heat pump
Reroof House only including complete tear off
INSTALL 2 MINI SPLIT CONDENSING UNITS WITH 3 INDOOR HEADS
replace 17 windows within existing openings.
(DMH - ProjectDox) INTERIOR NON-STRUCTURAL DEMO ONLY TO FRAMING IN 2-1/2 STORY SFD. ADDITIONAL CONSTRUCTION PLANS AND MECH. / ELEC./ PLUMB'G PERMITS REQUIRED. THE FOLLOWING IS THE APPLICANTS RESPONSE TO PLAN REVIEWS REQUEST FOR CONSTRUCTION PLANS;
2ND FLOOR BATH REMODEL AT SFD (MAA) SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. CARBON MONOXIDE ALARMS REQUIRED IN ACCORDANCE WITH MN. STAT. 299F.50 IRC 314.3.1. When interior alterations, re
Vent kitchen hood. Move heat run.
INSTALL/VENT BATH FAN ON FIRST FLOOR
Install kitchen sink, dishwasher, gas to range.
NON-STRUCTURAL KITCHEN REMODEL TO SFD INCLUDING REMOVAL OF EXISTING WALL FINISH (sza) INSTALL INSULATION AND VAPOR BARRIER AT EXTERIOR WALL CONDITIONS. REPLACE 2 WINDOWS IN EXISTING OPENINGS
KITCHEN REMODEL TO INCLUDE TWO WINDOWS AND ONE DOOR REPLACEMENT IN EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLANS). - INTERIOR DEMOLITION OF EXISTING KITCHEN AREA TO ALLOW FOR NEW RENOVATION WORK TO BE DONE. - REMODEL EXISTING KITCHEN AND REP
vent kitchen hood, zone boiler for kitchen remodel, add radiator in basement.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.