Minneapolis, MN
Minneapolis, MN
5
4
$6,747,091
Installation of condensate piping for HVAC units. Reviewed in the past under BLDG115383
Modify gas rough in per plumbing inspector. Connect new stove. Mike Brinda has reviewed current site conditions. All gas piping and appliances shall be installed in accordance with the 2020 Minnesota State Fuel Gas Code Code (MSFGC). A
Building HAVC upgrades. Replace 2 boilers and pumps, H.W. base boards, air handles, duct systems for kitchen and bathroom exhaust, provide new, fully ducted SCU for each dwelling, Dwelling unit and common area HVAC heating equipment consists of gas, elect
remodel 32 units fixtures and waste stacks All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Code (MSPC), Chapter 4714. All pipe, pipe fittings, traps, fixtures, material, and devices used in the plumbing sy
interior and exterior rehab of existing 4 story apartment building. no change to unit count. certificate of occupancy required: no occupancy: R2 2020 MSBC sprinklered: yes architect: megits #54767 Kaas Wilson engineer: w
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.