Minneapolis, MN
Minneapolis, MN
Minneapolis, MN
800 WASHINGTON AVE N, Minneapolis
EXTERIOR BUILDING RESTORATION INCLUDING SELECT BRICK REPLACEMENT, TUCK-POINTING, SEALANT REPLACEMENT, CONCRETE REPAIRS AND TERRACOTTA REPAIRS. (DMH -ProjectDox) (TractorWorks Building) IT IS THE RESPONSIBILITY OF THE PERMIT APPLICANT TO CAUSE THE WORK TO
800 WASHINGTON AVE N, Minneapolis
INTERIOR NON-STRUCTURAL DEMO SUITES 505 & 512 Cap and seal exposed penetrations as required for the IV construction side of the building Occupancy TBD
800 WASHINGTON AVE N, Minneapolis
spec office suite buildout - suite 250. sck certificate of occupancy required: no occupancy: b 2020 MSBC sprinklered: yes architect: HGA
800 WASHINGTON AVE N, Minneapolis
HVAC system for Tenant Improvement including VAV boxes, supply diffusers, return grilles and all associated duct work. Refer to attached drawings.
800 WASHINGTON AVE N, Minneapolis
FOR SUITE 208 BREAKROOM - SINK AND ELECTRIC WATER HEATER
800 WASHINGTON AVE N, Minneapolis
OFFICE INTERIOR REMODEL AT UNIT 4510 (MAA) certificate of occupancy required: NO ***** const type: IA ***occupancy: B ***2020 MSBC***** occupant load: ***** sprinklered: YES ***** Tenant: OST ***Floor(s): 4TH *****
800 WASHINGTON AVE N, Minneapolis
SWAPPING 3 OF THE EXISTINGIN ANTENNAS FOR 6 NEW ANTENNAS. SWAPPING 9 EXISTING RADIOS FOR 6 NEW RADIOS. ADDING TWO CABINNETS INSIDE EXISTING EQUIPEMENT ROOM. NO STRUCTURAL MODIFICATIONS REQUIRED TO BLDG. (JJL) EXISTING STRUCTURE ANALYZED BY ASSOCIATED
800 WASHINGTON AVE N, Minneapolis
(DMH - ProjectDox) 6,207 SQ.FT. INTERIOR DEMO ONLY OF OFFICE PARTITION WALLS IN SUITE 250. ADDITIONAL PLANS, APPROVALS AND PERMIT REQUIRED FOR REMODEL WORK. APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PROVIDED. APPLICANT
800 WASHINGTON AVE N, Minneapolis
BUILD ONE OFFICE IN SUITE 701. SCK
800 WASHINGTON AVE N, Minneapolis
Mod existing supply distribution with new GRDs for new fl plan in suite #500.
800 WASHINGTON AVE N, Minneapolis
FOR SUITE 520 BREAKROOM: ROUGH-IN AND INSTALL SINK, POINT OF USE UNDER THE COUNTER ELECTRIC WATER HEATER, AND HOOKUP DISHWASHER
800 WASHINGTON AVE N, Minneapolis
INTERIOR REMODEL SUITE 500 certificate of occupancy required: no ***** special inspections required: no***** const type: IV ***occupancy: B ***2020 MSBC***** occupant load: 96 ***** sprinklered: yes - above and below "clouds
800 WASHINGTON AVE N, Minneapolis
FOOD&HPC - 4TH FLOOR PLUMBING
800 WASHINGTON AVE N, Minneapolis
install glass security door in lobby on 5th floor. sck
800 WASHINGTON AVE N, Minneapolis
(DMH - ProjectDox) INTERIOR DEMO ONLY TO ENTIRE 4TH FLOOR OFFICE SPACE PARTITION WALLS AND FINISHES. NO DEMO TO BUILDING CORE RESTROOMS OR STAIR ENCLOSURES. ADDITIONAL PERMITS AND APPROVALS REQUIRED FOR ANY REMODELING. APPROVED PLANS AND PERMIT
800 WASHINGTON AVE N, Minneapolis
REPLACE FRONT STEPS (MAA) AS PER APPLICANT, Yes, the existing granite slabs are going to be removed and replaced with new pieces over and existing footing/foundation Yes, the building is accessible
800 WASHINGTON AVE N, Minneapolis
EXTERIOR RESTORATION. TUCKPOINTING, BRICK REPLACEMENT, SEALANT, ETC. 6 STORY ELEVATION ON SOUTH SIDE. (JJL)************** NO STRUCTURAL REPAIRS ARE SHOWN ON THIS PERMIT. STRUCTURAL WORK WILL REQUIRE ENGINEERING AND AN ADDITIONAL PERMIT. *************
800 WASHINGTON AVE SE, Minneapolis
800 WASHINGTON AVE N, Minneapolis
process piping, cooking oil storage tanks
800 WASHINGTON AVE N, Minneapolis
ROUGH IN/INSTALL BREAK SINK, ELECT WATER HEATER
800 WASHINGTON AVE N, Minneapolis
HVAC MODS FOR NEW TENNANT SUITE #150 / NO NEW EQUIPMENT
800 WASHINGTON AVE N, Minneapolis
Tenant Improvement ***** certificate of occupancy required: no ***** special inspections required: no***** occupancy: B ***2015 MSBC***** occupant load: 79 ***** sprinklered: yes ***** Tenant: Nicollet Investments ***Suite
1800 WASHINGTON AVE S, Minneapolis
repair section of brick damaged by vehicle on main level.
800 WASHINGTON AVE N, Minneapolis
MINOR DUCT MODS FOR NEW FLOOR PLAN
800 WASHINGTON AVE N, Minneapolis
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.