Minneapolis, MN
Minneapolis, MN
Minneapolis, MN
800 NICOLLET MALL, Minneapolis
HVAC for new layout refer to attached drawings.
800 NICOLLET MALL, Minneapolis
us bank remodel lobby permit application submitted prior to Jan1, 2025
800 NICOLLET MALL, Minneapolis
Rework existing system per approved plan.
800 NICOLLET MALL, Minneapolis
T/I #2660 const type: IA occupancy: B 2020 MSBC sprinklered: yes architect: 17408 - Hustad, Mary B
800 NICOLLET MALL, Minneapolis
Rework existing HVAC for new layout. No new equipment. Air Balance. Per approved plan.
800 NICOLLET MALL, Minneapolis
SUITE 2950/SMITH GENDLER BREAKROOM FIXTURES - Remove existing sink and install new sink and dishwasher at same location
800 NICOLLET MALL, Minneapolis
HVAC for remodel of US BankCorp. lobby. BLDG1096105 NTERIOR LOBBY REMODEL. LEVEL 1 AND 2. (JJL) BLDG1078028 certificate of occupancy required: no special inspections required: yes TERRACON const type: IA occupancy:
800 NICOLLET MALL, Minneapolis
SUITE 2950. INTERIOR REMODEL. (JJL) certificate of occupancy required: no special inspections required: no const type: IB occupancy: B, A 2020 MSBC occupant load: 67 sprinklered: yes 20% accessibility upgra
800 NICOLLET MALL, Minneapolis
T/I - STE 3010 const type: IA occupancy: B 2020 MSBC architect: 59613 - Santema, Jolene Lorraine
800 NICOLLET MALL, Minneapolis
Rework existing ductwork and diffusers for new layout. Demo. 1 FCU and associated chiller water piping.
800 NICOLLET MALL, Minneapolis
DEMO EXISTING SINK, INSTALL PLUMBING FOR NEW BREAK SINK. SUITE 3010
800 NICOLLET MALL, Minneapolis
BLDG1093327 Replace diffusers, branch ducts, and relocate a VAV as well as a FPVAV. Balancing dampers are needed at all new branch ducts and branch mains.
800 NICOLLET MALL, Minneapolis
#2680 breakroom sink, water heater and appliances
800 NICOLLET MALL, Minneapolis
#2925 breakroom sink, water heater and appliances
800 NICOLLET MALL, Minneapolis
INTERIOR LOBBY REMODEL. LEVEL 1 AND 2. (JJL) certificate of occupancy required: YES special inspections required: yes TERRACON const type: IA occupancy: B, S-2, A-2 2020 MSBC occupant load: LEVEL 1 = 359, LEVEL 2 =
800 NICOLLET MALL, Minneapolis
remodel office suite 2925. certificate of occupancy required: no const type: 1a occupancy: b 2020 MSBC sprinklered: yes sac: _0_ charges __ met council letter dated _10/4/24_ architect: hustad
800 NICOLLET MALL, Minneapolis
TENANT IMPROVEMENT INTERIOR REMODEL WORK OF EXISTING TENANT SPACE - SUITE 2680 IN 800 NICOLLET MALL - US BANCORP CENTER COMMERCIAL BUILDING. AAJ (PROJECT DOX PLANS) certificate of occupancy required: NO mechanical plans required for certificate of oc
800 NICOLLET MALL, Minneapolis
Replace dishwasher
800 NICOLLET MALL, Minneapolis
Rework of existing ductwork and diffusers per approved plans.
800 NICOLLET MALL, Minneapolis
Plans available. I advised contractor to use fire or fire smoke dampers where needed to maintain assembly rating. BLDG1075891
800 NICOLLET MALL, Minneapolis
Tenant Improvement - Unit 450, COTY Inc certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC occupant load: 71 sprinklered: yes architect: Douglas Kahl
800 NICOLLET MALL, Minneapolis
FOR 13TH FLOOR/EIDE BAILEY - NEW UNISEX ADA COMPLIANT RESTROOM & CAFE
800 NICOLLET MALL, Minneapolis
REMODEL SUITE 1300 const type: IB occupancy: B 2020 MSBC architect: 42506 - Guyette, Timothy D.
800 NICOLLET MALL, Minneapolis
Rework HVAC for new office floor plan. Plans uploaded in projectdox BLDG1061301
800 NICOLLET MALL, Minneapolis
#2700 interior office remodel certificate of occupancy required: no const type: 1-A occupancy: B 2020 MSBC occupant load: no change sprinklered: yes Tenant: Robert Half Floor(s): 27th
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.