Minneapolis, MN
Minneapolis, MN
Minneapolis, MN
800 NICOLLET MALL, Minneapolis
Bathroom remodel -ACW certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC sprinklered: yes architect: Blewitt, Matthew John
800 NICOLLET MALL #240, Minneapolis
Restaurant TI -ACW certificate of occupancy required: no special inspections required: no const type: IA occupancy: B 2020 MSBC occupant load: 33 sprinklered: yes Tenant: Egg Flip Floor(s): skyway le
800 NICOLLET MALL, Minneapolis
HVAC alterations include modifying the existing distribution system through the current air handling units, installing new fan-powered and VAV boxes to suit the new floor layout, installing two computer room air handling units, all associated hydronic pip
800 NICOLLET MALL, Minneapolis
The project consists of the renovation of one floor of an existing high rise building -ACW certificate of occupancy required: no special inspections required: no const type: I-A occupancy: B 2020 MSBC occupant load:
800 NICOLLET MALL, Minneapolis
Supply and install plumbing for 1 break sink, 3 lavs, 3 water heaters, 1 drinking fountain, 1 toilet and connect appliances.
800 NICOLLET MALL, Minneapolis
HVAC alteration for tenant build-out at 28th floor. Installing fan-powered boxes, VAV box, GRDs, and all associated ductwork per approved plans. emailed applicant on required license flag - 2025-12-05 - lea
800 NICOLLET MALL, Minneapolis
demo 2 breakroom sinks and 2 drinking fountains
800 NICOLLET MALL #224, Minneapolis
Plumbing for kitchen remodel. All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Code (MSPC), Chapter 4714. All pipe, pipe fittings, traps, fixtures, material, and devices used in the plumbing system shall comply
800 NICOLLET MALL, Minneapolis
office remodeling of suite 2850. certificate of occupancy required: no const type: 1a occupancy: b 2020 MSBC sprinklered: yes sac: _0_ charges __ met council letter dated _11/25/25_ architect: hustad Nelson A
800 NICOLLET MALL, Minneapolis
Demo only (for office build out under separate permit) -ACW certificate of occupancy required: no special inspections required: no 2020 MSBC Floor(s): 28th architect: Mary Hustad (Nelson)
800 NICOLLET MALL, Minneapolis
Add 2 break sinks, Dishwasher, water to coffee dispensers and 1 extending water.
800 NICOLLET MALL, Minneapolis
Suite 1200 -Interior Demolition Only const type: 1A occupancy: B 2020 MSBC sprinklered: yes architect: Stephanie McDaniel #42183
800 NICOLLET MALL #224, Minneapolis
HVAC alteration using the existing distribution system through the current air handling units, reusing existing grease hood and exhaust and make-up air unit, replacing existing fan-coil unit to suit the new floor layout, and installing an exhaust fan, GRD
800 NICOLLET MALL #224, Minneapolis
Tenant Improvement - Mother Dough Bakery - Suite 224 certificate of occupancy required: no special inspections required: no occupancy: A-2 2020 MSBC sprinklered: yes sac: 11.02 charges 11.02 credits = 0.00 net met council letter
800 NICOLLET MALL, Minneapolis
Suite 205. Furnish and install 6 supply diffusers, 4 are lay in diffusers and 2 are linear diffusers, 2 R.A. grills, cap 2 supply's and reroute fan coil condensate drain piping. BLDG1150393
800 NICOLLET MALL, Minneapolis
Tenant improvement in existing space -ACW certificate of occupancy required: no special inspections required: no const type: I-A occupancy: B 2020 MSBC occupant load: 7 sprinklered: yes SAC: Total Charge: 0.24 T
800 NICOLLET MALL, Minneapolis
FOOD Crisp 1 sink, stand pipe and electric water heater
800 NICOLLET MALL #180, Minneapolis
Mother Dough Suite #180 SAC (250904A1) Payment for 5 charges that was affiliated with permit BLDG1078028
800 NICOLLET MALL #224, Minneapolis
interior demo only in suite 224.
800 NICOLLET MALL, Minneapolis
Rework existing vav's and duct systems to accommodate new office configuration. Suite 2690 BLDG1134185
800 NICOLLET MALL, Minneapolis
Suite 2690 Install waste vent and water. install 1 sink, 1 water heater and 1 dishwasher.
800 NICOLLET MALL, Minneapolis
Gas and flue to (1) fireplace
800 NICOLLET MALL, Minneapolis
SUITE 2690 - TENANT IMPROVEMENT (MAA) certificate of occupancy required: yes no mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ special inspections required: yes no const ty
800 NICOLLET MALL, Minneapolis
HVAC alterations include modifying the existing distribution system through the current air-handling units, reusing existing fan-powered and VAV boxes to suit the new floor layout, GRDs, and all associated ductwork as per the approved plans.
800 NICOLLET MALL, Minneapolis
T/I SUITE 2520 const type: IIB occupancy: B 2020 MSBC occupant load: 217 sprinklered: yes no Tenant: Floor(s): sac: __ charges __ credits = __ net met council letter dated __ architect: 53761 - Blew
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.