Minneapolis, MN
Minneapolis, MN
Minneapolis, MN
800 LASALLE AVE, Minneapolis
800 LASALLE AVE, Minneapolis
TENANT IMPROVEMENT 15TH FLOOR SUITE 1535 - APPROX 2500 SQ FT. SCK#1
800 LASALLE AVE, Minneapolis
BUILD OUT ON PARTIAL 10TH FLOOR SUITE 1000 APPROX 3,457 SF OFFICES (JAG) certificate of occupancy required : no special inspections required:no const type: I-A occupancy: B 2015 MSBC occupant load: 35 sprinklered: yes energy code
800 LASALLE AVE, Minneapolis
FOR SUITE 1000 - INSTALL PLUMBING FOR BREAKROOM SINK
800 LASALLE AVE, Minneapolis
REMODEL EXISTING OFFICE SPACE (WSS certificate of occupancy required no special inspections required no const type: TYPE 1 occupancy: B 2015 MSBC occupant load: 66 sprinklered: yes Tenant: CITIES MARKET STUDIOS F
800 LASALLE AVE, Minneapolis
INTERIOR REMODEL AT EXISTING OFFICE SAPCE AT SUITE 2200 (MAA) certificate of occupancy required yes no special inspections required yes no const type: I A occupancy: B
800 LASALLE AVE, Minneapolis
Break Room for Suite 2125 on 21st Floor. Food Ok.
800 LASALLE AVE, Minneapolis
TENANT IMPROVEMENTS IN SUITE 2125 (KAS#1) DEMO EXISTING PARTITION WALLS FOR NEW certificate of occupancy required no mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ special inspectio
800 LASALLE AVE, Minneapolis
kitchen sink and elec water heater unit#1725
800 LASALLE AVE, Minneapolis
RECONFIGURE EXISTING OFFICE SPACE (WSS) SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. CARBON MONOXIDE ALARMS REQUIRED IN ACCORDANCE WITH MN. STAT. 299F.50 IRC 313.2.1. When interior alterations
800 LASALLE AVE, Minneapolis
1ST FLOOR FITNESS CENTER - connect existing bldg. supply to fan coil units - provide indirect MUA unit @ 250mbh for locker room exhaust and toilet exhaust - provide distribution ductwork per engineered plans
800 LASALLE AVE, Minneapolis
1st floor el.wtr htr 6 floor drains 10 lavs 8 showers breakroom sink 1 standpipe 4 urinals 1 water cooler
800 LASALLE AVE, Minneapolis
tenant INTERIOR REMODEL APPROX 1,440 SF TENANT SPACE OFFICES AT PARTIAL 18TH FLOOR SUITE 1800. TOTAL FLOOR APPROX 20,961 SF. certificate of occupancy required yes no mechanical plans required for certificate of occupancy mechanical plans/letter of mean
800 LASALLE AVE, Minneapolis
State Theater - Demo grease duct , ductwork and cap louver at wall - install VAV box, ductwork, diffusers per engineered drawings State Theater - Demo grease duct , ductwork and cap louver at wall - install VAV box, ductwork, diffusers per engineered dra
800 LASALLE AVE, Minneapolis
Interior remodel BLDG71898 (T95097) was canceled and replaced by this permit *A-R/R ASSEMBLY OCCUPANCY REMODEL OR REPAIR certificate of occupancy required yes mechanical plans required for certificate of occupancy special inspections required
800 LASALLE AVE, Minneapolis
Relocate 4 diffusers - add 1 diffuser - relocate 1 fan powered VAU box (Suite 1640) Relocate 4 diffusers - add 1 diffuser - relocate 1 fan powered VAU box
800 LASALLE AVE, Minneapolis
Add 6 diffusers - relocate 2 diffusers - relocate thermostats - relocate 1 VAU box - suite 2150 Add 6 diffusers - relocate 2 diffusers - relocate thermostats - relocate 1 VAV box -Suite 2150
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.