Minneapolis, MN
Minneapolis, MN
Minneapolis, MN
800 LASALLE AVE, Minneapolis
SUITE 1040. REMOVING INTERIOR WALL. SOME ELECTRICAL IN WALL. NEW FINISHES. (JJL)
800 LASALLE AVE, Minneapolis
(DMH-Pdox) OFFICE DEMO ONLY. SUITE 200. - 2020 MNSBC APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PROVIDED. APPLICANT IS REQUIRED TO PRINT COPIES OF ELECTRONIC APPROVED PLANS AND DOCUMENTS FROM PROJECTDOX AND HAVE A HARD C
800 LASALLE AVE, Minneapolis
Relocating diffusers per approved plan.
800 LASALLE AVE, Minneapolis
Interior remodel to combine two existing office suites on 16th floor -ACW certificate of occupancy required: yes special inspections required: no const type: I-A occupancy: B 2020 MSBC occupant load: 89 sprinklered: yes
800 LASALLE AVE, Minneapolis
T/I SUITE 400 - ADD VENDING ROOM const type: IA occupancy: B 2020 MSBC architect: 20507 - Helland, Terrell Lee
800 LASALLE AVE, Minneapolis
#2800 dishwasher
800 LASALLE AVE, Minneapolis
Rework branch ducts for tenant changes, adding 1 new FPVAV for offices and, adding 1 new heatpump for server room. Heat pump must be provided with proper access. The drawing shows sheetrock ceiling below H.P. however keynote 1 is stating acoustical ceilin
800 LASALLE AVE, Minneapolis
not food and beverage - no plumbing plan review required - 2025-03-18 - lea
800 LASALLE AVE, Minneapolis
Tenant Improvement - Suite 1290 - Russell Reynolds Associates certificate of occupancy required: no special inspections required: no const type: II-A (assumed) occupancy: B 2020 MSBC occupant load: 22 sprinklered: yes
800 LASALLE AVE, Minneapolis
BLDG1105427
800 LASALLE AVE, Minneapolis
#1250 - KITCHEN & BREAKROOM FIXTURES - Replace existing sinks and faucets per plans - one in kitchen and one in secondary breakroom
800 LASALLE AVE, Minneapolis
T/I SUITE 1250 const type: occupancy: B 2020 MSBC occupant load: 191 sac: _4.54_ charges _5.01_ credits = _-0.47_ net met council letter dated _12/31/24_ architect: 17408 - Hustad, Mary B
800 LASALLE AVE, Minneapolis
Replace dishwasher
800 LASALLE AVE, Minneapolis
gas firepit. gas line by others
800 LASALLE AVE, Minneapolis
800 LASALLE AVE, Minneapolis
HVAC per plans. Rework HVAC to accommodate new floor plan. BLDG1064354
800 LASALLE AVE, Minneapolis
restrooms, break room and lounge
800 LASALLE AVE, Minneapolis
REMODEL OF LEVEL 4 TO CREATE OFFICE AMENITY SPACE, INCLUDING ROOF DECK AND STAIR SHAFT AT LEVEL 2. NO PENETRATIONS PERMITTED WITHIN NEW STAIR SHAFT. (JJL) certificate of occupancy required: yes for roof deck special inspections required: yes BR
800 LASALLE AVE, Minneapolis
1. Approval of these plans shall not be construed as permitting a violation of the building codes or any other laws or ordinances. 2. The airside economizer shall equipped with economizer fault detection and diagnostics (FDD) to meet MEC 2020 section C
800 LASALLE AVE, Minneapolis
BUILD PICKLE BALL SAUNA const type: IA occupancy: B 2020 MSBC sprinklered: YES sac: _1.00_ charges __ credits = _1.00_ net met council letter dated _3/21/24_ architect: Norback, David C - 11902 engineer: Thomas, Matt
800 LASALLE AVE, Minneapolis
rearrange diffusers and ductwork
800 LASALLE AVE, Minneapolis
Install (1) new 2" floor drain and (1) new 3/4" cold water hose bib for new plunge pool room in 1st floor Pickleball Court Area.
800 LASALLE AVE, Minneapolis
Replace dishwasher ste 2150
800 LASALLE AVE, Minneapolis
REPLACE ~20 DIFFUSERS
800 LASALLE AVE, Minneapolis
FOR SUITES 0875, 2050, & 2250 - REPLACE 6 SINKS(NOT FOR ANY FOOD ESTABLISHMENTS)
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.