Minneapolis, MN
Minneapolis, MN
281
16
$74,610,182
reconfiguration of CT room on 1st floor. sck#1 certificate of occupancy required no special inspections required no const type: 1a occupancy: I2 2015 MSBC architect: abeln
build out of 6th floor of existing hospital. sck#1 **** schulze center neurosciences inpatient unit certificate of occupancy required no *****special inspections required yes *****const type: 1a *****occupancy: I2 ***** 2015 MSBC *****sprinklered: ye
1ST FLOOR DEMO / ADD 2 LIEBERT UNITS FOR 1ST FLOOR W/ DUCTS AND PIPING
remodel existing pharmacy area on first floor. sck#1 certificate of occupancy required no special inspections required no const type: 1a occupancy: I2 2015 MSBC sprinklered: yes Tenant: hospital pharmacy Floor(s): 1
NEW BATHROOM
REPLACING SA DIFFUSERS
6th floor build out - 314 fixtures
HORIZONTAL WASTE PIPE SERVING HEART HOSP 7TH FLOOR
renovation of Fluoroscopy room 1602 certificate of occupancy required NO special inspections required YES - FIRE RATED PENETRATIONS const type: I-A occupancy: I-2 2015 MSBC sprinklered: YES Tenant: ABBOTT HOSPITAL Floo
REMODEL OF MECHANCIAL ROOMS. GENERAL MECHANICAL RENOVATION WITH MISC PATCH AND REPAIR WORK.
abbott hospital ep-01 renovation, Adding one VAV box , Some duct work, adding a split system 3 ton, The seer for this split condensing unit should be minimum 13 seer. adding a duct humidifier. Refer to attached drawings.
abbott hospital ep-01 renovation
reconfigure surgery room EP-1 on 3rd floor. sck#1 certificate of occupancy required no const type: 1a occupancy: I2 2015 MSBC sprinklered: yes architect: sessions
DUCTWORK TO AIR HANDLER UNIT ON ROOF PER ENGINEERED DRAWINGS Disconnect and remove existing fan to be relocated. Reinstall existing exhaust fan and provide with curb adapter.
remodel existing chapel space. sck#1 certificate of occupancy required no mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ special inspections required yes no const type: 1a
Remove 6 fire dampers and replace with 6 fire/ smoke dampers
HEATING EQUIPMENT2 VAV's, piping and new ducts w/ 3 S/F dampers.
SURGERY UNIT (S-1A) - MAKEUP AIR UNIT, DAMPER CONTROL & RELATED WORK PER ENGINEERED DRAWING
remodel cardiac monitoring suite on 6th floor. sck#1 sac: _0_charges met council letter dated _5/1/18_ architect: leo daly
first floor patient rep office - refrigeration piping & 3 TON AC
cardio remote monitoring / Main West 6th floor AC
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.