Remodeling HVAC system for oncology offices, adding 5 VAV boxes and on exhaust fan. Refer to attached drawings.
INSTALL 2 NEW VAV'S / GRD,S
3RD FLOOR/CV LAB 5 & CV LAB 7. Replace with near-identical equipment. No increase in loads or change of anchorage to pan joist structure. 2 new FS dampered penetrations of compartment walls south side of CV-5 (see 803.M). Architect: Smith #20095 Mec
Adding a centralized air handling unit that will replace four existing air handling units with associated duct work and piping and steam heat exchanger. Refer to attached drawings.
RELOCATE OWNERS EXISTING STERILIZERS AND STEAM PIPING
PLUMBING VENTS (11) ON ROOF CHARGED FOR 2 FIXTURES PER DAN CALLAHAN
WASTE WATER VENT PIPING
RENOVATION OF EXISTING OR 23 AND OR 25 SPACE TO ACCOMADATE NEW MEDICAL EQUIPMENT. ROOMS ARE LOCATED ON LOWER LEVEL. MAIN HOSPITAL, AREA "A" OPERATING ROOMS PER KEY PLAN. SPECIAL INSPECTIONS ARE REQUIRED PER SECTION 1705.16 FOR FIRE-RESISTANT PENETRATIONS
LOWER LEVEL. OFFICE REMODELED INTO A WORK STATION AREA. LOCATED LOWER LEVEL, AREA B. MAIN HOSPITAL. DOOR NUMBER ON PLANS IS E0236 IMPLANT STORAGE. (JJL)
1 NEW VAV / DUCTS / RELOCATE GRILLES & DIFFUSERS PER PLANS / MOST OF THE WORK IS DEMO CAP & SEAL DUCTS / DEMO FCU'S & PIPING CAP AT MAINS / DEMO MED GAS OUTLETS & PIPING BACK TO ZONE VALVE
REPLACE VAV'S & DUCTS FOR NEW LAYOUT / NO OTHER NEW EQUIPMENT
VAV,S WITH REHEAT COILS / FIRE SMOKE DAMPERS / DUCTS PER ENG. PLANS
MECHANICAL SYSEMT UPDGRADE WITH ASSOCIATED BUILDING MODIFICATIONS certificate of occupancy required YES special inspections required YES sprinklered: YES Tenant: Courage Kenny Floor(s): Lower 1, 2, 3, 4 and Roof sac: __charges __credits = __
8 fixtures in the restroom
Refer to attached drawings
VENT/LOW PRESSURE STEAM/CHILLED WATER-AHU S REBUILD
VENT/REFRIG/HOT WATER-HEART HOSPITAL PET CT
VENT/REFRIG/HOT WATER-5TH FLOOR PIPER / VAV'S & DUCT UPDATES
1ST FLOOR REMODEL OF PREP/RECOVERY ROOMS. NO STRUCTURAL WORK. NO MODIFICATIONS TO EXITING. (JJL) certificate of occupancy required no mechanical plans required for certificate of occupancy - NOT REVIEWED mechanical plans/letter of means of compli
Refer to attached drawings.
replace sink in ct room
REMODEL CT ROOM certificate of occupancy required NO special inspections required YES - FIRE RATED PENETRATIONS const type: occupancy: I-2 2015 CONSERVATION CODE - WORK AREA METHOD - LEVEL 2 AND LEVEL 3 ALTERATION occupant load: