Minneapolis, MN
Minneapolis, MN
281
16
$74,610,182
Interior Rmdl Of Decontamination Area Of Sterile Processing certificate of occupancy required no special inspections required no const type: I-B occupancy: I-2 2020 MSBC occupant load: no change sprinklered: yes Floor(s): Low
Adding new duct work per new rooms layout, reusing existing VAV boxes, adding a unit heater and piping. The highlighted plan area ramp 7 level 1 on M301 is the only scope of this permit work.
HVAC upgrade adding 3 VAV boxes, water source unit heater, piping , supply diffusers, return grilles and all associated duct work. Refer to attached drawings.
ABBOTT NORTHWEST HOPSITAL - PIPER BUILDING TO RADIATION ONCOLGY LINK.
Temporary relocating two existing cooling towers and associated piping and valves per attached plans.
Replacing a 10 ton chiller, hydronic piping and duct modification,new grilles and diffusers. Refer to attached drawings.
addition of exterior wall and corridor. interior remodel of corridors, patient rooms and lobby areas within first floor piper building. sck certificate of occupancy required no special inspections required yes const type: 1a occupancy: I
area 7 reroof - tear down to insulation and install new ballasted EPDM system.
2nd Floor Pharmacy Pass-Through Window certificate of occupancy required: no ***** special inspections required: no***** const type: 1A ***occupancy: B ***2020 MSBC***** sprinklered: yes ***** architect: Daniel Abeln #53825
LOWER LEVEL REMODELING - ADDED VALUE TO 835225 certificate of occupancy required no special inspections required no const type: 1-A occupancy: B (small assembly per 303.1.2) and S-1 supporting I-2 hospital 2020 MSBC occupant load:
construct medical gas tank enclosure adjacent to 28th st.. sck special inspections required
FOR LINEAR ACCELERATOR ROOM - ADD SINK AND FLOOR DRAIN
Replace (1) Existing Drinking Fountain with new
Modification of HVAC system adding reheat coil, supply diffusers, return grills and all associated duct work. Refer to attached drawings.
interior remodeling of linear accelerator room B. sck certificate of occupancy required no const type: 1a occupancy: I2 2020 MSBC sprinklered: yes energy code chapter used: architect: smith #20095
REMODEL LL MAIN WEST FOR CENTRAL LINEN, EVS LOUNGE, AND LOCKER ROOM (scope added and approved) certificate of occupancy required no special inspections required no const type: 1-A occupancy: B (small assembly per 303.1.2) and S-1 supporting I
ADDITION OF FLOOR DRAIN, RELOCATION OF SINK AND ICE MAKER LOCATED IN THE LOWER LEVEL OF HOSIITAL, LINEN CLEANING ROOM.
HVAC system, including air handling unit, VAV boxes, air valves, exhaust fans, unit heaters, supply diffusers, return grills and all associated duct work. Refer to attached drawings.
PIPER BLDG ANW-PHARM & FINAL STATE INFUSION
INSTALL ONE 8" X 4" ROOF DRAIN ON EMERGENCY DEPARTMENT CANOPY
Reconfiguration of HVAC system including six VAV boxes and dampers, hydronic piping, supply diffusers, return grills and all associated duct work. Refer to attached drawings.
Reconfiguration of HVAC system including three dual duct VAV boxes, supply diffusers, return grills and all associated duct work. Refer to attached drawings.
Adding two 20 ton unit to supply outside air to tunnel serving the other indoor units.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.