REPAIR STRUCTURAL COMPONENT - CONCRETE COLUMNS AT 2 LOCATIONS IN PARKING GARAGE ----- engineer: DANIEL E MURPHY - 13373 occupancy: S-2 construction type: I-B sprinklered: NO ----- Issuance of this permit shall not be construed as allowing a violat
FOR WASIE BUILDING TEMPORARY OFFICES ON 1ST FLOOR - ADD 1 HANDWASHING SINK
TEMPORARY HEATERS - Provide temp service heat for a new and existing parking garage under construction at Abbott Northwest. Gas pipeline to be installed and service 10 temp heaters (Hi-Lo DF Heaters). Each heater can consume up to 1,500 CFH - Totaling a
FOR PIPER BUILDING'S BRONCHOSCOPY ROOM - REPLACE AND RELOCATE SINK
Interior Remodel of Bronchoscopy Room (rm 8) certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC sprinklered: yes architect: Michael Nelson #42247
Replacement with 2 new boilers - each over 400K BTUH
HVAC system for temporary construction office, modifying existing ductwork per new layout. Refer to attached drawings.
HVAC system for 3 story addition to existing ramp and new ramp adding 4 air handling unit, 4 VAV boxes, electric heaters, six exhaust fans, supply fan. twelve ductless split cooling system, GRDs and all associated ductwork. Refer to attached drawings.
infill indoor pool in Wasie building and remodel for temporary offices certificate of occupancy required: no special inspections required: no sprinklered: no architect: none engineer:
Furnish and install plumbing scope for Abbott NW Transportation HUB project. Scope includes: expansion to parking ramp 6 and construction of new parking ramp 7 at Abbott NW hospital. Ramp 6 is adding 2 levels and Ramp 7 is 8 levels.
REPLACE LARGE/HEAVY MACHINE/EQUIPMENT, RENOVATE ROOM INCLUDING MACHINE SUPPORTS & ROOM FINISHES - EXISITNG MEDICAL PROCEDURE ROOM ----- 2020 MINNESOTA STATE BUILDING CODE architect: PETER G SMITH, 20095 engineer: MARK CACKOSKI, 25835 occupancy: I-2 const
Adding a VAV box and two air dampers, DX split system, hot water piping to VAV box coil, duct work modification, supply diffusers and return grilles per attached drawings.
INSTALL 1 NEW AUXILIARY DRAIN OUTLET BOX. NEW MEDGAS AND WASTE PIPING. PROJECT HAPPENING ON 3RD FLOOR AT ANW MAIN HOSPITAL FOR EP-2 ROOM.
Due to new construction on adjacent land, relocating three louvers and providing combination of fire and smoke dampers as shown on attached drawings.
Adding a supply diffuser and fire smoke damper per attached plan.
Installation of (4) sinks and (3) floor drains at ANW on the lower level SPS Sinks and Caviwaves E0261 Room.
remodel portions of wound clinic on 4th floor west tower. sck certificate of occupancy required no const type: occupancy: 2020 MSBC sprinklered: yes Tenant: wound clinic Floor(s): 4 architect: leo daly
INTERIOR REMODEL OF EXISTING 1 - 2 HEALTHCARE OCCUPANCY TO CONVERT OFFICE AND WAITING AREAS TO NEW FLUOROSCOPY IMAGING ROOM WITH CONCTROL AREA. AAJ (PROJECT DOX PLANS AND DOCUMENTS). certificate of occupancy required: NO mechanical plans required for
Modification of HVAC system, adding one VAV box , supply diffusers, exhaust grilles and all associated duct work. Refer to attached drawings.
Demo two exhaust grilles and adding one new supply diffuser and associated duct work per attached plans.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.