Modification of supply duct, exhaust duct, and new GRD installation. Refer to attached drawings.
remodel 4 existing seclusion room areas on 3rd and 4th floor - courage Kenny medical building. certificate of occupancy required: no const type: 1b occupancy: b 2020 MSBC sprinklered: yes Tenant: abbott architect:
Adding three VAV boxes with reheat coil, relocating existing VAV boxes, GRDs and all associated ductwork. Refer to attached drawings.
HVAC system, installing new fan-powered box with hot water heating, split DX cooling system include indoor fan-coil and outdoor condensing unit, condensate pump, hydronic piping, GRDs and all associated ductwork. Refer to attached drawings. This is compan
Ductwork modification and diffuser installation per attached drawings.
Modifying breakroom duct work, low pressure steam piping, GRDs and all associated ductwork. Refer to attached drawings.
INSTALL 2 BREAK ROOM SINKS, FLOOR DRAINS, CLEAN OUT AND ICE MAKER. RECONNECT 2 OWNER PROVIDED WASHERS AND OWNER PROVIDED 3 COMP SINK.
INTERIOR REMODEL OF EXISTING ENDOSCOPY ROOM ON 5TH FLOOR AT ABBOTT NORTHWESTERN HOSPITAL. NO STRUCTURAL WORK. (JJL) SOME WORK ON THE FLOOR UNDER BLDG908871. certificate of occupancy required no special inspections required no const type:
lower level remodel of quick turn room and staff break lounge. certificate of occupancy required: no const type: 1a occupancy: I2 2020 MSBC sprinklered: yes architect: nelson
Direct replacement of existing waste piping in Piper bldg canopy area. No Fixtures
REPLACE DEFS (Direct-Applied Exterior Finish System) SOFFIT AND LEAKING AND DAMAGED PIPING Provide non-combustible framing, Batt insulation (not foam plastic), and Densglass Fireguard Sheathing as detailed. New or disrupted penetrations of the concrete
Abbott Northwest Hospital Security Upgrades Required egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort or shall comply w/ MSBC Section 1010.1.9.7. certificate of occupancy required: no
minor security upgrades - mainly card readers and cameras.
HVAC system for wide open shell area for Simulation lab, Conference center and board room, installing 25000 CFM air handling unit, two exhaust fans, electric humidifier, 28 VAV boxes, exhaust hood, GRDs and all associated ductwork. Refer to attached drawi
Alteration for new bike center, adding 4100 cfm air handling unit, two rooftop units, one heat pump, eight electric unit heaters, eleven VAV boxes, air curtain, GRDs and all associated ductwork. Refer to attached drawings.
Adding two supply duct and diffusers, exhaust duct , two fire dampers and associated per attached plan.
Minor alterations on 3rd floor - relocation of PEI pharmacy. certificate of occupancy required no const type: 1a occupancy: I1 2020 MSBC sprinklered: yes Tenant: ANW Floor(s): 3rd
Replacing an existing chiller with 56 tons air cooled chiller adding heat exchanger, supply and return chilled water pipes, replacing one pump. Refer to attached drawings.
RESTROOM & BREAKROOM FIXTURES FOR NEW SIMULATION LAB+CONFERENCE CTR+BOARD RM ADDITION
FIXTURES FOR NEW BIKE CENTER ON 10TH AVE SIDE OF CAMPUS
LOWER LEVEL SURGERY AREA - PHASE I REMODELING certificate of occupancy required no special inspections required no const type: I-A occupancy: I-2 2020 MSBC occupant load: no change sprinklered: yes architect: Nelson #4224
(DMH - ProjectDox) REMODEL/ UPDATES TO 988 SQFT. RECEPTION AND WAITING AREA, AND 1 EXAM ROOM AT MAIN FLOOR LEVEL. ROOMS CK1750, CK1751 & CK1766. Const type: I Occupancy: B 2020 MSBC Sprinkled: YES 20% accessibility upgrades: COMPLIANT
This permit is companion of permit BLDG912815, adding smoke damper and duct per attached plan.
This permit is companion of BLDG894021, The scope of work for this permit is just sheet metal rough-in for the storefront area of ramp 7. Refer to attached drawings.
HVAC renovation for bronchoscopy area, replacing one VAV box with hydronic coil and exhaust fan, adding GRD's and all associated ductwork. Refer to attached drawings.