alterations related to equipment upgrades for winter cooling. engineer: trofimova-peterson #23148
New diffuser layout. BLDG1107239
Demo (1) existing sink. Provide and install (1) new sink faucet and trim for integral sink.
Replacing GRDs and all associated ductwork per approved plans.
remodel X-ray room C. certificate of occupancy required no const type: 1a occupancy: I2 2020 MSBC architect: daly
Installing two VAV boxes, GRDs and all associated ductwork per approved plans.
1st and 2nd Flr NUC Med and Uptake - Scope of work: Demo (1) mop sink and (1) ss drop in counter sink. Provide and install (1) mop sink and (1) ss drop in counter sink.Fixture counts are: (1) Mop sink.(1) SS drop in hand sink
. The specific area of work was not identified in the construction documents.
Provide and install (1) RO/ DI system. Connect water and waste to existing services. Install(1) floor drain. (1) mop sink.
remodel nuclear medicine and uptake area on 2nd floor heart hospital building. certificate of occupancy required no const type: 1a occupancy: I2 2020 MSBC sprinklered: yes architect: johansen #53808
Replace existing side hinged doors with new sliding glass doors and 90 minute rated overhead coiling door per drawings, the doors being replaced are not a required part of the means of egress for either building. certificate of occupancy required: no
(11) Temporary Gas Heaters will be installed at Abbott Northwestern Surgical and Critical Care building, connecting to Holmes Heart Hospital and the TAF building. The Lower-Level through Level 10 will be heated with the (11) gas heaters, all varying in MB
Update MRI-C Rooms E 1897 and E 1892 for new Exablate equipment on level 1 of the main hospital certificate of occupancy required: no special inspections required: no SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDI
Installing 5 fire/smoke dampers in new central heating plant basement tunnel. Plans uploaded. BLDG1058241
Abbott Northwestern Hospital - Piper Building AHU repairs/upgrades. Replace supply fans, return fans, cooling coils, and humidifiers in (3) existing air handling units. Lower level Piper S-3, Ground level Piper S-1, 2nd floor Piper S-7.
Flat Roof - EPDM General requirements for flat roof replacements. The roof covering is to meet the Minnesota Building code performance requirements of Section 1504, the fire classification of Section 1505 and the material requirements as specified in s
Relocate one existing sink in existing Xray Room
Modify existing return ductwork in Xray room and change eggcrate size in one location
Demoing and re-routing equipment, duct, and piping in demolition zone per approved plans. This permit is just for temporary demolition, Contractor shall obtain mechanical permit for future remodeling.
COMERCIAL ROOF REPLACEMENT. (JJL) ENGINEER TO REVIEW WINDOW WASHING ANCHORS.
Demo - Heart Hospital Main Lobby Area Levels 1, 2, & 3 certificate of occupancy required: no special inspections required: no const type: 1-A occupancy: I-2 2020 MSBC occupant load: TBD sprinklered: yes architec
Selective demolition and construction of valet hut and connections to existing parking helix certificate of occupancy required: no special inspections required: yes const type: 2-B occupancy: B 2020 MSBC occupant load:
Modify duct for new floor plan. Plans are available.
Minor duct alterations. Plans available. Level 2 H2171 C5 command center