Minneapolis, MN
Minneapolis, MN
281
16
$74,610,182
SCRUB SINK
RECONFIGURE OPERATING ROOM, ADJACENT HALLWAY AND EQUIPMENT SUPPORT ROOM TO ACCOMODATE NEW EQUIPMENT (WSS) certificate of occupancy required no mechanical plans submitted special inspections required no const type: 1A occupancy: I2
FOR WASIE BUILDING ROOM 603 - INSTALL HAND WASHING SINK AND EYE WASH STATION
REPLACE (3) EXISTING WATER SOFTNERS WITH NEW EQUIPMENT IN BOILER PLANT
FOR SECOND FLOOR LABORATORIES - RELOCATE EXISTING HANDWASHING SINK, CONNECT 2 HANDWASHING SINKS THAT ARE OWNER SUPPLIED, ADD 2 FLOOR DRAINS
Replace two air handling units, steam and chilled water, HP steam reducing station, piping.
REMODEL EXAM ROOM TO TWO ACUPUNCTURE ROOMS (JAG) certificate of occupancy required: no special inspections required: no const type: I-A occupancy: B (CLINIC) 2015 MSBC occupant load: NA sprinklered: yes energy code chapter used: 201
REMOVE AND REPLACE EXISTING ROOFING AND INSULATION PER PLANS AND SPECS - ABBOTT NORTHWESTERN (WSS)
HIGH PRESSURE STEAM PIPING, MAKE UP AIR. REPLACE STERILE DECONTAMINATION WASHER DISINFECTORS, AUTOCLAVES AND CART WASHERS AT ANW CENTRAL PROCESSING HP license # HC000038
FLOOR DRAINS, WASHER-DISINFECTORS, AUTOCLAVES AND CART WASHER
REPLACE EXISTING VAV BOX. REPLACE EXISTING SUPPLY DUCTWORK FOR REPLACEMENT VAV BOX. MODIFY EXISTING HW PIPING FOR REPLACEMENT VAV BOX.
HOSPITAL ROOM REMODEL - ABBOTT NW- THIRD LEVEL CV-9 EQUIPMENT REPLACEMENT certificate of occupancy required no mechanical plans/letter of means of compliance submitted\ special inspections required no const type: TYPE 1 A occupancy: I-2
Roof work on a single story portion of the hospital. Replacing air handling units. Associated work includes structural steel framing to serve as the base of the units. The steel frame with be tied to the existing structure. Additional work includes de
1st floor kitchen- Cap existing kitchen exhaust - connect new dishwasher - alter ductwork per engineered drawings 1st floor kitchen- Cap existing kitchen exhaust - connect new dishwasher - new heating coils - alter ductwork per engineered drawings
1st floor kitchen
Non-structural remodel 15,780 s.f. tenant space on 6th floor. No change in occupant load or use. special inspections required no Tenant: Twin City spine center Floor(s): 6 sac: _9.04_charges _8.79_credits = _0.25 or 0_ net met council lette
Replace /fire smoke damper - 4th floor
replace 6 high pressure steam sterilizers
6TH FLOOR - ADJUST DIFFUSERS FOR ADDED ROOMS AND CEILINGS ( GENERAL AREAS & NEW ROOMS)
2 SINKS (OTHER)
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.