Minneapolis, MN
Minneapolis, MN
5440 OLIVER AVE S, Minneapolis
BATHROOM REMODEL (WSS) \SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. CARBON MONOXIDE ALARMS REQUIRED IN ACCORDANCE WITH MN. STAT. 299F.50 IRC 313.2.1. When interior alterations, repairs or add
5105 OLIVER AVE S, Minneapolis
fireplace
4948 OLIVER AVE S, Minneapolis
fireplace and gas line
3522 OLIVER AVE N, Minneapolis
KITCHEN & BATH REMODEL & NEW 40 GALLON GAS WATER HEATER
1922 OLIVER AVE N, Minneapolis
new water heater
3522 OLIVER AVE N, Minneapolis
INSTALL BASEMENT EGRESS WINDOW PER DEPARTMENT BULLETIN. (sza) THIS PERMIT FOR AN EGRESS WINDOW IN NO WAY ALLOWS CREATION OF AN ADDITIONAL DWELLING UNIT NOR DOES IT MAKE A BASMENT BEDROOM LEGAL THAT WAS BUILT WITHOUT A PERMIT. ADDITIONAL PERMITS ARE REQU
5045 OLIVER AVE S, Minneapolis
replace a/c
2911 OLIVER AVE N, Minneapolis
drain tile
6037 OLIVER AVE S, Minneapolis
FIREPLACE
5049 OLIVER AVE S, Minneapolis
replace furnace ductwork and a/c
5704 OLIVER AVE S, Minneapolis
water heater
4942 OLIVER AVE N, Minneapolis
Tear-off & re-roof house.
3522 OLIVER AVE N, Minneapolis
CHIMNEY DEMO REFRAME NEW BATHROOM DOOR, OPEN WALL , remove portion of basement floor. KITCHEN REMODEL TO SFD INCLUDING REMOVAL OF EXISTING WALL FINISH INSTALL INSULATION AND VAPOR BARRIER AT EXTERIOR WALL CONDITIONS. Work is in addition to p
5228 OLIVER AVE N, Minneapolis
BASEMENT EGRESS WINDOWS & WELLS (2) TO FRONT YARD, REM BASEMENT FOR BED AND BATH, REM KIT MAIN FLR REMOVING 3 WINDOWS AT SFD (JAG) FRAME AND FINISH FOR 12' X 11' BASEMENT BEDROOM AND 6' X 11' BATH AND FAMILY ROOM FINISH. INSTALL 6 MIL POLY ON BLOCK, 2X
2316 OLIVER AVE S, Minneapolis
REPLACE FURNACE AND A/C
5228 OLIVER AVE N, Minneapolis
bathroom: bathtub, sink, toilet, shower, shower valve, kitchen: dishwasher and sink
5228 OLIVER AVE N, Minneapolis
fans, gas piping, and venting
2943 OLIVER AVE N, Minneapolis
replacing 7 windows
4937 OLIVER AVE S, Minneapolis
GAS RE-PIPE AFTER METER MOVE - PIPING ONLY $1500 MISC. GAS
5821 OLIVER AVE S, Minneapolis
gas dryer
3621 OLIVER AVE N, Minneapolis
change out furnace
6010 OLIVER AVE S, Minneapolis
2 ton a/c
3522 OLIVER AVE N, Minneapolis
REROOF; REPLACE EXISTING BASEMENT POST; REPLACE DECK BOARDS AND NEW STEP; REPLACE MAIN ENTRANCE DOOR; REPLACE 6 WINDOWS (WSS) SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. CARBON MONOXIDE ALARMS
3711 OLIVER AVE N, Minneapolis
Tear off and re-roof house and garage
5655 OLIVER AVE S, Minneapolis
INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. (JAG) COLLECTOR CAPACITY _7.36___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 Subp.5a. ADDITIONAL PERMITS: PV SYSTEMS ALSO REQUIRE AN ELECTRICAL PE
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.