Saint Louis Park, MN
Saint Louis Park, MN
Saint Louis Park, MN
7600 27th St W, Saint Louis Park
Sprinkler System NFPA 13, Relocate five (5) heads for new ceiling in office
7600 27th St W, Saint Louis Park
Fire Alarm System, Replace panel
7600 27th St W, Saint Louis Park
Principal Building, Existing FACP replaced w./ new Fire alarm control panel
7600 27th St W 219, Saint Louis Park
Principal Building, install 30 circuits for equip. install 2-208, 20
7600 27th St W, Saint Louis Park
Principal Building, Replace 2 unit heaters
7600 27th St W, Saint Louis Park
Principal Building, Install lights, voice/data jacks in 3 locations
7600 27th St W, Saint Louis Park
Principal Building, 2 rpz overhauls see attached
7600 27th St W A7, Saint Louis Park
Principal Building, Wire new hood over degeaser(208v, sa, single phase
7600 27th St W A7, Saint Louis Park
Principal Building, Install 8- Defrosr time clocks w/ T stats for cool
7600 27th St W, Saint Louis Park
Principal Building, relocate existing pan wash, install floor sink, dr
7600 27th St W 231, Saint Louis Park
Principal Building, relocate flue piping for pan wash unit
7600 27th St W, Saint Louis Park
Land Use Registration, proposed business- Recycling of computer systems
7600 27th St W, Saint Louis Park
Food Plan Review, flooring
7600 27th St W, Saint Louis Park
Land Use Registration
7600 27th St W, Saint Louis Park
Principal Building, Install presure VB @wash station next to three com
7600 27th St W, Saint Louis Park
Sprinkler System NFPA 13
7600 27th St W 231, Saint Louis Park
Principal Building, install RTU, chiller, modify ductwor
7600 27th St W, Saint Louis Park
Principal Building, install refrig. equip. for walk-in
7600 27th St W, Saint Louis Park
Sprinkler System NFPA 13
7600 27th St W, Saint Louis Park
Principal Building, remodel restrooms, floor drains
7600 27th St W, Saint Louis Park
Principal Building, wire building expansion
7600 27th St W 231, Saint Louis Park
Principal Building, expansion of dough production
7600 27th St W, Saint Louis Park
Food Plan Review, remodel existing facility, panera
7600 27th St W, Saint Louis Park
Principal Building, hook up for walk in cooler
7600 27th St W, Saint Louis Park
Principal Building, HVAC remodel, Bay A-7
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.