Minneapolis, MN
Minneapolis, MN
9
5
$223,500
replace existing RTU with new 7.5 ton RTU Review Note: Unless technically unfeasible, new and replacement rooftop equipment shall be provided with insulated curbs as described in the 2024 Minnesota Energy Code Sections 5.5.3.1and 6.1.1.3.6 - which
Scope includes sinks, grease trap, floor drain. All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Code (MSPC), Chapter 4714. All pipe, pipe fittings, traps, fixtures, material, and devices used in the plumbing sy
HVAC system installing a rooftop unit, GRDs and all associated ductwork per approved plans.
APPLE SPICE EXPANSION TO ADJACENT SUITE. (JJL) certificate of occupancy required: no special inspections required: no const type: II-B occupancy: B 2020 MSBC occupant load: 47 sprinklered: yes Tenant: APPLE SP
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.