Rochester, MN
Rochester, MN
413
4
$10,650
1
Sprinkler Stub-out
Electrical - panel upgrade
Mechanical - furnace replacement
Replace furnace and air conditioner
ELectircal/one outlet circuit had to be rerouted and reconnected. Tapped off circuit for new switch and new outside light. Remove window and replace with a 36" exterior door 2 x 10 headers. Build stairs up to doorway to code requirements.
Remove window and replace with a 36" exterior door 2 x 10 headers. Build stairs up to doorway to code requirements. | Other
Electrical - repair broken UG service ent wire
Mechanical/replace furnace & a/c
Interior Alteration | Other
Electrical/homeowner did the work/we are redoing the wiring - Interior Remodel of Home. Stop Work order was placed on home. New Sheetrock, existing vapor barrier, replacement windows & new doors and frames.
Electrical/bath remodel - Master bath remodel, master bedroom remodel. Open 2 small bedrooms to create master suite
Plumbing for Master bath remodel, master bedroom remodel. Open 2 small bedrooms to create master suite
Master bath remodel, master bedroom remodel. Open 2 small bedrooms to create master suite | Other
Mechanical/HVAC for furnace & a/c replacement w/chimney
Electrical/furnace & a/c replacement
Mechanical/furnace replacement
Mechanical/put new duct/main & lower level/(Old were broken down and stolen) Interior Remodel of Home. Stop Work order was placed on home. New Sheetrock, existing vapor barrier, replacement windows & new doors and frames.
Plumbing/put in new copper tubing where needed/replace tub & toilet (vandals stole copper) Interior Remodel of Home. Stop Work order was placed on home. New Sheetrock, existing vapor barrier, replacement windows & new doors and frames.
Interior Remodel of Home. Stop Work order was placed on home. New Sheetrock, existing vapor barrier, replacement windows & new doors and frames. | Other
Electrical/change 100A fuse panel to 100A circuit breakers
Electrical for LOWER LEVEL BATHROOM REMODEL
Plumbing/replace & relocate plumbing for new shower stall/replace plumbing for vanity/lower level bathroom/lLOWER LEVEL BATHROOM REMODEL
Mechanical/replace/relocate an existing exhaust fan for lower level/LOWER LEVEL BATHROOM REMODEL
LOWER LEVEL BATHROOM REMODEL | Basement Finish
Electrical/conversion of former indoor firing range to storage space/relocate 3 phase panel/power to RTU and exhaust fan
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.