Minneapolis, MN
Minneapolis, MN
700 5TH ST N, Minneapolis
Chilled water piping to fermentation tanks.
700 5TH ST NE, Minneapolis
METER MOVE - Q3 2018 BATCH #3
5700 15TH AVE S, Minneapolis
METER MOVE - Q3 2018 BATCH #1
700 5TH AVE SE, Minneapolis
DRYER
5700 25TH AVE S, Minneapolis
Reroofing detached garage only
700 5TH ST N, Minneapolis
Just a small 60000 BTU/HR Walk in cooler
700 5TH ST NE, Minneapolis
REPLACE WATER HEATER
700 5TH ST N, Minneapolis
extend supply duct with 2 openings and add bathroom exhaust system per approved plans
700 5TH AVE N, Minneapolis
Replace 2 ton A/C.
700 5TH ST N, Minneapolis
CIDER HOUSE #12 - ALT DUCTS & CONTROLS, ADD 3 ELECTRIC UNIT HEATERS,EXTEND DUCTWORK FROM EXISTING RTUS PER ENGINEERED DRAWINGS.
700 5TH ST N, Minneapolis
UNIT 220-PLUMBING CIDER HOUSE
700 5TH ST N, Minneapolis
NEW UNDERGROUND PLUMBING FOR FUTURE TENANTS - NO FIXTURES
700 5TH ST N, Minneapolis
FOR BAY 6 - NEW RESTROOM
4700 5TH AVE S, Minneapolis
Meter Move Q3-2017 Batch #8
700 5TH AVE SE, Minneapolis
Replace 3 windows into existing openings
3700 5TH AVE S, Minneapolis
REPLACE WATER HEATER
700 5TH ST N, Minneapolis
4 FIXTURES
700 5TH ST N, Minneapolis
11 roof drains install new water main for future tenant 400 feet
700 5TH ST N, Minneapolis
Replace 12 Rooftop units and install supply air ductwork
4700 15TH AVE S, Minneapolis
REPLACE GAS DRYER
4700 15TH AVE S, Minneapolis
RE-ROOF HOUSE ONLY
700 5TH ST N, Minneapolis
STABILIZATION & VANILLA SHELL FINISH TO EXISTING 1 STORY, 56,000+ SF WAREHOUSE/FACTORY BUILDING. (DMH#1) FUTURE USES ARE INTENDED FOR OFFICE SPACES. NO RESTROOMS PROVIDED IN THIS BUILDING PERMIT. REMODEL INCLUDES INSTALL NEW WINDOW OPENINGS WITH STEE
3700 45TH AVE S, Minneapolis
replace water heater
4700 15TH AVE S, Minneapolis
detached garage CONSTRUCT DETACHED _22__ BY _22__ WOOD FRAME GARAGE FIRE WALL WITH MAX 4 INCH EAVE AT 1 FT TO SIDE P/L. PFH BRACING AT DOOR WALL. GENERAL COMMENTS: APPLICANT MUST LOCATE AND IDENTIFY THE PROPERTY STAKES AND CALL FOR INSPECTION FOR BUI
4700 15TH AVE S, Minneapolis
bathroom remodel with insulation/durarock/ tile around wet areas and exterior wall. (kas#2) kitchen remodel with one existing window to be close with insulation/poly/ drywall in opening. New cabinets and countertops. 2nd floor railing replaced with code
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.