Cut and cap existing 1 1/8 PE gas service. Tie into existing 8" gas main. Directional bore 50' at a 48" depth. Install 1/2" PE gas service at operating pressure 22-66PSIG. Restore work area to original conditions. Please see prints for further details.
657 ARLINGTON AVE E, Saint Paul
1321 ARLINGTON AVE W, Saint Paul
1657 ARLINGTON AVE E, Saint Paul
Cut and cap existing 1 1/8 PE gas service. Tie into existing 8" gas main. Directional bore 50' at a 48" depth. Install 1/2" PE gas service at operating pressure 22-66PSIG. Restore work area to original conditions. Please see prints for further details.
1935 ARLINGTON AVE E, Saint Paul
743 ARLINGTON AVE W, Saint Paul
1754 ARLINGTON AVE E, Saint Paul
Work will be done early spring: DIRECTIONAL BORE FROM THE TIE IN PIT AT THE EXISTING GAS MAIN ON ARLINGTON AVE E, SOUTH APPROXIMATELY 16' TO THE PROPERTY AT 1754 ARLINGTON AVE E, TO RENEW EXISTING GAS SERVICE.
1794 ARLINGTON AVE E, Saint Paul
1713 ARLINGTON AVE E, Saint Paul
Cut and cap existing 1 1/8 PE gas service. Tie into existing 8" gas main. Directional bore 50' at a 48" depth. Install 1/2" PE gas service at operating pressure 22-66PSIG. APPROX.120' ROVING PARKING LANE / 40' ROVING SIDEWALK Restore work area to original conditions. Please see prints for further details.
1637 ARLINGTON AVE E, Saint Paul
BORE 300' GAS SVC ACR ARLINGTON BET GERMAIN & KENNARD;APPROX.120' ROVING PARKING LANE / 40' ROVING SIDEWALK / BLVD/ Cut and cap existing 1 1/8 PE gas service. Tie into existing 8" gas main. Directional bore 50' at a 48" depth. Install 1/2" PE gas service at operating pressure 22-66PSIG. Restore work area to original conditions. Please see prints for further details.
1595 ARLINGTON AVE E, Saint Paul
BORE 303' GAS SVC ACR ARLINGTON BET HAZELWOOD & GERMAIN; Roving distance of 80' Construction to be done early spring. Pot hole watermain prior to construction. Excavate 4'x4' bore pit. Cut and cap existing 1 1/8 PE gas service. Tie into existing 8" gas main. Directional bore 50' at a 48" depth. Install 1/2" PE gas service at operating pressure 22-66PSIG. Restore work area to original conditions.
1935 ARLINGTON AVE E, Saint Paul
1460 ARLINGTON AVE E, Saint Paul
2156 Arlington AVE E UNIT 3, Saint Paul
Carrier Air Handler with Resistance Duct Heater Carrier Mini-Split 24k BTU Heat Pump Main floor warm air supplies -7 Main floor cold air returns - 3 Second floor warm air supplies - 6 Second floor cold air returns - 4 All duct work sealed with mastic Registers Vent 3 bath fans. Vent dryer. Vent Kitchen Hood Install Broan ERV
220 ARLINGTON AVE W, Saint Paul
REMOVE AND REPLACE 2 WINDOWS, SAME SIZE, NO STRUCTURAL CHANGE.
387 ARLINGTON AVE E APT 102, Saint Paul
1395 ARLINGTON AVE W, Saint Paul
Replace water heater
800 ARLINGTON AVE W, Saint Paul
Continued storage.
164 ARLINGTON AVE W, Saint Paul
Lead Free 2025
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.