Minneapolis, MN
Minneapolis, MN
311
2
$128,430
1
Install Furnace
water heater replacement
Replacement of A.O. Smith Water Heater
Replacement of Furnace
INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __5.74__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 Subp.5a as applicable. ADDITIONAL PERMITS: PV SYSTEMS ALSO REQUIRE
Main ducts from RTU1 are existing. BLDG1082903
Install make up air system in mechanical room
Replacing 1 double sliding patio door- no changes to rough opening
Reroof on front right elevation on upper side.
Install a black 60 mil EPDM membrane roof system and high back gutter on your Rear Porch:
Remove existing roofing. Install new shingle roof system complete with required underlayment, flashing and trim.
METER MOVE Q1 - 2024 BATCH 9
Tear off and reroof the residential house and detached garage.
Small kitchen remodel with one kitchen sink and one dishwasher.
Tear-off and re-roof house only
Tear off and reroof the residential house. 16sq
Installing as 3 head ductless mini split
Remodel: install kitchen sink, dishwasher, island sink.
vent 300 cfm's kitchen out side wall
KITCHEN REMODEL. NO STRUCTURAL WORK. (JJL) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. SMOKE ALARMS RE
REPLACE GAS DRYER
Replacing 6 existing windows
INSTALL STRUCTURAL SUPPLEMENT AT FOUNDATION WALL Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. SMOKE ALA
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.