Saint Paul, MN
Saint Paul, MN
6
0
Replacing fire alarm control panel to allow for additional zones. Adding pull station and cover by gas shutoff, adding smoke detector and pull at panel.
1. Remove all rock, existing flashings, and metal accessories. Material to be disposed of in approved dumpsters 2. Inspect the existing roof system and nailers. Any deteriorated nailers to be replaced with specific new wood to match the existing thickness at unit cost. Remove and replace damaged insulation at unit cost. Any deteriorated decking to be repaired/replaced with new decking to match the existing thickness at unit cost. Verify the existing roof is clean and dry per the manufacturer's requirements. 3. Add additional wood blocking at curb penetrations to ensure the manufacturer's recommended flashing height. 4. Over the prepared decking structure, install a manufacturer's approved coverboard to achieve a 20-year warranty per the manufacturer's recommendation and details 5. Install a new 60mil fully adhered TPO roof system per manufacturer's recommendations and details to achieve a 20-year-old warranty. 6. All pipe penetrations and pitch pockets to receive new manufacturer-appro
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.