Minneapolis, MN
Minneapolis, MN
Minneapolis, MN
600 HENNEPIN AVE, Minneapolis
Install will include rotating an existing exhaust fan, stainless steel ducting to a new type 1 stainless steel hood over a Nieco Searing unit, gas piping connections to the unit, and external ducting on the roof to the exhaust fan. Controls and insulatio
600 HENNEPIN AVE, Minneapolis
(DMH-ProjectDox) TEAR OFF EXISTING ROOF MEMBRANE TO EXISTING INSULATION AND INSTALL NEW 1/2" HD ISO BOARD AND MECHANICALLY FASTEND 60 MIL EPDM. APPORX 52,871 SQFT. PER PLAN. APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PROVID
600 HENNEPIN AVE, Minneapolis
INSTALL ICEMAKER AND NEW FLOOR DRAIN
600 HENNEPIN AVE, Minneapolis
replace exhaust add inline fan
600 HENNEPIN AVE E, Minneapolis
Per phone call with Scott Matis at Hays Mechanical on 6/15/21 quantities indicated on permit application are incorrect. The scope of the project includes replacement of existing building drain piping in a restaurant, installing a new floor drain, reconne
600 HENNEPIN AVE E, Minneapolis
Installing dishwasher type 2 hood, fan and associated duct work per attached plan.
600 HENNEPIN AVE E, Minneapolis
T/I BRASA - RESTAURANT REMODEL RECONFIGURE BATHROOM APPROACH AND A COUNTER --- ARCHITECT: JEREMY G NELSON, 45181 2020 MINNESOTA STATE BUILDING CODE ------ certificate of occupancy required: NO mechanical plans required for certificate of occupancy
600 HENNEPIN AVE E, Minneapolis
INSTALL 18000 BTU REFER SYSTEM SERVING WALK IN COOLER / CONDENSING UNIT LOCATED ON ROOF TOP
600 HENNEPIN AVE, Minneapolis
FOR #200/TIMBERWOLVES E-SPORTS - 2 PRIVATE RESTROOMS INCLUDING INSTANT TYPE WATER HEATER
600 HENNEPIN AVE, Minneapolis
NEW ADA BATHROOMS TO EXISTING SPACE. NO STRUCTURAL WORK. THIS PERMIT IS NOT VALID FOR ANY ADDITIONAL WORK. (JJL)************* certificate of occupancy required no mechanical plans required for certificate of occupancy NOT SUBMITTED******** mechanical plan
600 HENNEPIN AVE, Minneapolis
RELOCATE DIFFUSERS ONLY FOR 2ND FLOOR
600 HENNEPIN AVE, Minneapolis
demo and reconfiguration suite #200. sck#1 professional video game training space. certificate of occupancy required no special inspections required no const type: 1a occupancy: A3 2015 MSBC occupant load: 87 sprinklered: yes Tenant: e sports architect: h
2600 HENNEPIN AVE, Minneapolis
Boiler repair, retube and miscellaneous repairs.
3600 HENNEPIN AVE, Minneapolis
New 15 ton a/c condenser - The proposed AC is on the administration building. note: if a/c operates more than 20hrs a week economizer cycle is required
1600 HENNEPIN AVE, Minneapolis
redoing kitchen on 1st floor
1600 HENNEPIN AVE, Minneapolis
Meter Move Q4-2017 Batch #5
2600 HENNEPIN AVE, Minneapolis
INSTALL MECHANICALLY FASTED 50 MIL SINGLE -PLY DURO-LAST ROOF SYSTEM. DTC INCLUDES FLASHING, SCUPPERS, VENTS, WALK PADS, ETC. PER ROOFING SCOPE. APPROX. 2900 SQ. FT. BUILDING TENANT:CHIPOTLE
600 HENNEPIN AVE, Minneapolis
Super Bowl - Temp Assembly Occupancy suite 160 First floor. VIP Space - Host Committee - Includes leveling floors, providing ADA accessibility and emergency lighting const type: I-A occupancy: A-3 2015 MSBC occupant load: 427 sprinklered
1600 HENNEPIN AVE, Minneapolis
1600 HENNEPIN AVE, Minneapolis
GAS METER
600 HENNEPIN AVE, Minneapolis
Tech Center, Test Kitchen, and parking levels.
600 HENNEPIN AVE, Minneapolis
NEW HEADQUARTERS FOR JACK LINK BEEF JERKY. 2 STORY BUILD OUT WITH NEW OFFICE SPACE, LOBBY TEST KITCHEN AREA AND RD/TECH CENTER (WSS) certificate of occupancy required yes mechanical plans/letter of means of compliance submitted\ special inspections
600 HENNEPIN AVE, Minneapolis
Work to include electric high pressure steam (60psi) boiler for process steam,, 48 electric duct heaters, 3 MUA Units 1@ 800MBH, 1 @ 600 MBH, & 1 without gas, (55) fan coil units, 10 fans, 3 electric unit heaters, 2 electric radiant ceiling panels, electr
600 HENNEPIN AVE, Minneapolis
21,000 sf of tenant improvement located on the 2nd and 3rd floors of the Mayo Clinic Sports Medicine Center. certificate of occupancy required yes mechanical plans/letter of means of compliance submitted\ special inspections required no const typ
600 HENNEPIN AVE, Minneapolis
INSTALL NEW RTU WITH DUCT DISTRIBUTION TO 83 CHILLED BEAMS - INSTALL NEW EXHAUST FAN - 2ND & 3RD FLOOR -
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.