Saint Paul, MN
Saint Paul, MN
124
6
FURNACE REPLACEMENT
Replace furnace Lennox ML193UH110XE60C 110,000 BTU 93% Heat Loss: 88702
Replace furnace Lennox ML193UH110XE60XK 110000 btu 93% Heat Loss: 88702
Replace Gas Water Heater
WE WILL BE REMODELING (2) BATHROOMS, REPLACING PLUMBING FIXTURES, NEW TILE FLOORING WITH IN-FLOOR HEAT, MINIMAL CABINETRY AND MILLWORK. WE WILL BE PAINTING THE BATHROOMS, AND UPDATING ELECTRICAL FIXTURES. The following "Trade" Permits are required for this project: Electrical, W.Air Vent, Plumbing, 2/3/25: MAILED PERMIT, PLACARD & STAMPED DRAWINGS – AC
10.725kW AC / 14.19kW DC PV SYSTEM CONSISTING OF (33) SILFAB (SIL-430QD) MODULES, ENPHASE IQ8M MICRO INVERTERS, AND BOS COMPONENTS. The following "Trade" Permits are required for this project: Electrical, The following "Trade" Permits are required for this project: Electrical, 12/23/24: MAILED PERMIT, PLACARD & STAMPED DRAWINGS – AC
Tear-off and re-roof entire house
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.