UPDATE FINISH IN CORRIDOR AN TOILET ROOMS REMODEL FOR NEW ACCESSIBLE SHOWER certificate of occupancy required: NO **** const type: III-B ***occupancy: B ***2015 MSBC***** occupant load: NO CHANGE ***** sprinklered: YES ***** Fl
575 9TH ST SE, Minneapolis
INSTALL NEW DUCTS FOR NEW OFFICE BUILD OUT / ALL RTU'S ARE EXISTING / NEED TO VERIFY DUCT DETECTION AND AUDIO & VISUAL ALARM
575 9TH ST SE #200, Minneapolis
Window Replacement/Interior Wall Demo Windows shall meet the energy requirements of the Minnesota State Building Code. Safety glazing shall be required in hazardous locations designated in the Minnesota State Building Code. certificate of occupancy requ
575 9TH ST SE, Minneapolis
OFFICE BUILDOUTIN SUITE 60. APPROX 6200 SQ FT. SCK***** certificate of occupancy required: no ***** const type: 2B ***occupancy: B ***2015 MSBC***** occupant load: 63 ***** sprinklered: yes ***** energy code chapter us
575 9TH ST SE, Minneapolis
Adding new 4 ton rooftop unit for an open space office. Refer to attached drawings
575 9TH ST SE, Minneapolis
REPLACE 3 DIFFUSERS / REPLACE 1 EXHAUST FAN FOR RESTROOM
575 9TH ST SE, Minneapolis
SUITE 95 TENANT IMPROVEMENT - NEW SKKYLIGHTS. NO STRUCTURAL WORK. DO NOT CUT EXISTING ROOF JOISTS. NO CHANGE OF EXITING. NEW FLOOR FINISHES. NEW DOORS. (JJL) certificate of occupancy required: no mechanical plans required for certificate of oc
575 9TH ST SE, Minneapolis
unisex restroom and breakroom
575 9TH ST SE, Minneapolis
SUITE 52 TENANT IMPROVEMENT. "DR CASSIE". UPDATING BATHROOM TO BE ADA. REMODELING EXISTING OFFICE SPACES. MISC FRAMING. NO STRUCTURAL WORK. (JJL)************ certificate of occupancy required: s no***************** mechanical plans required for
575 9TH ST SE, Minneapolis
TENANT IMPROVEMENT FOR NEW OFFICE SPACE IN EXISTING COMMERCIAL MIXED-USED BUILDING. AAJ#2 certificate of occupancy required: NO mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ spec
575 9TH ST SE, Minneapolis
replace dishwasher suite # 200
575 9TH ST SE, Minneapolis
REPLACE (2) RTU'S WITH CARRIER 8.5 TON/180MBH RTUS AND DUCTWORK PER ENGINEERED DRAWINGS
575 9TH ST SE, Minneapolis
unit # 200 ri and install 1 part sink 1 pou water water
575 9TH ST SE, Minneapolis
TENANT IMPROVEMENT AT SUITE 200 (MAA) certificate of occupancy required: NO mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ special inspections required: yes no const type:
575 9TH ST SE, Minneapolis
REMOVE 2ND FLOOR WINDOWS ALONG SW FACADE AND REOPEN WINDOW OPENINGS TO INSTALL NEW WINDOWS AT EXISITNG BLOCK PORTION OF BUILDING AND NEW OPENINGS AT NEWER CONNECTION OVER EXISTING DRIVE THRU. (LAH) ARCH: KENNETH PIPER #23542
575 9TH ST SE, Minneapolis
REMOVE EXISTING WOOD FRAMED ACCESSIBLE RAMP AND REBUILD NEW CONCRETE CCESSIBLE RAMP WITH STEPS, GUARDS AND HANDRAILS. AAJ#1 ARCHITECT: NATHANIEL SHEA, AIA REGISTRATION #24515. SEE PLAN FOR DETAIL SCOPE OF WORK TO BE DONE AS WELL AS PLAN REVIEW CO
5753 19TH AVE S, Minneapolis
heat/cool/vent system
575 9TH ST SE, Minneapolis
FOR 2ND FLOOR - TOILET, LAVATORY, FLOOR DRAIN AND WATER LINE FOR FUTURE BREAKROOM SINK
5753 19TH AVE S, Minneapolis
METER MOVE Q4 - 2016 BATCH #1 METER MOVE Q4 - 2016 BATCH #1
575 9TH ST SE, Minneapolis
MOP SINK
575 9TH ST SE, Minneapolis
interior DEMO SELECT OFFICE PARTITION WALLS IN SUITE 70 OF EXISTING WAREHOUSE BUILDING AND CONSTRUCT NEW 54' LONG "WALL CLIMBING" STRUCTURE WITH (DMH#1) STEEL BEAMS AND LVLs PER ENGINEER DRAWINGS. NO CHANGE IN EXITING OR OCCUPANCY. IF REQUIRED BY BUI
575 9TH ST SE, Minneapolis
registers Install new sa ductwork and 12 supply air registers.