Minneapolis, MN
Minneapolis, MN
Minneapolis, MN
575 9TH ST SE, Minneapolis
Upgrades to spec warehouse shell. Note, shell only. Certificate of occupancy and separate construction permit required for each future tenant improvement. Payment of SAC charges is required at time of Tenant Improvement -ACW certificate of occupancy
575 9TH ST SE, Minneapolis
1. Approvalof these plans shall not be construed as permitting a violation of the buildingcodes or any other laws or ordinances. HVACsystem for Planet Fitness, installing rooftop units, exhaust fans, GRDs and all associated ductwork per approved plans.
575 9TH ST SE, Minneapolis
Scope includes the installation of bathroom and shower fixtures. All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Code (MSPC), Chapter 4714. All pipe, pipe fittings, traps, fixtures, material, and devices used i
5753 19TH AVE S, Minneapolis
We are removing the chimneys exterior masonry to the roof line and will rebuilt it with new brick, a limestone drip edge and a reinforced concrete cap.
575 9TH ST SE, Minneapolis
INFILL MODIFICATION TO EXTERIOR WALLS (MAA) architect: NATE SHEA - 24515
575 9TH ST SE, Minneapolis
TEMPORARY HEATER - GAS 500000 BTU
575 9TH ST SE, Minneapolis
REMODEL - SUITE 150, 'PLANET FITNESS' certificate of occupancy required: YES const type: IIB occupancy: A3 2020 MSBC occupant load: 341 sprinklered: yes sac: __11.57 charges __2.66 credits = __8.91 net met council
575 9TH ST SE, Minneapolis
UNIT 80. PARTITION WALLS. NON COMBUSTIBLE CONSTRUCTION. (JJL) certificate of occupancy required: no special inspections required: no const type: II-B occupancy: B, S-2 2020 MSBC occupant load: 47 sprinklered: yes
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.