Minneapolis, MN
Minneapolis, MN
63
10
$3,358,834
1
INSTALL OWNERS FIREPLACE MATERIALS BY BUILDER, GAS LINE TO FIREPLACE, GAS LINE TO RANGE WITH FINAL CONNECTIONS.
HVAC for new SFD
Second floor; 2 toilets, 1 bathtub, 1 shower 2 laves, 1 laundry tray. Main floor: 1 kitchen sink, 1 dishwasher, 1 lave 1 toilet. Basement 1 floor drain, 1bath tub, 1 toilet, 1 lave. 1 water heater.
REPLACE FURNACE. MODIFY 4 DUCT RUNS, INSTALL 2 RETURN RUNS AND 3 BATH FANS
BASEMENT, MAIN AND 2ND FLOOR REMODEL OF EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLANS). ***04/28/2022 - COMPLETE PLAN REVIEW PROCESS FOR REVISIONS AFTER PERMIT ISSUANCE CYCLE #1 TO BATHROOM FIXTURES LAYOUT AS NOTED ON REVISED MAIN FLOOR PLAN. I
Whole home remodel, new underground and above ground DWV. New hot and cold water piping. Install new power vent water heater.
(DMH-ProjectDox) Construct 2-Story Single Family Dwelling with finished basement bedroom and bathroom, and new 22 by 22 detached garage. (based on MASTER PLAN 2020-915977) 2020 MNSBC/2018 IRC Energy Code: MN Rules Chapter 1322 Certificate of Occupa
R & R 1 existing window, no structural change.
Replace Air conditioner
Remove and replace roofing shingles ASHALT
Replacing existing furnace and air conditioner with new Lennox, 98% efficient, 66000 BTU furnace and new Lennox 2 ton, 16 SEER air conditioning system.
INSTALL 3 INSERT WINDOWS IN BASEMENT
Tear off house and garage, repair and sheathing and flashing. Use Ice and Water to code, 30 pound felt and limited lifetime architectual shingles, replacing all valleys, frost free vents and broans.
REMOVE AND REPLACE TWO BUS WASHING STATIONS
REPLACE FURNACE AND AC
replace three windows, insert installation
CONSTRUCT DETACHED 16' BY 20' WOOD FRAME GARAGE. GARAGE RETAINING WALL CONDITIONS: NO GENERAL COMMENTS: APPLICANT MUST LOCATE AND IDENTIFY THE PROPERTY STAKES AND CALL FOR INSPECTION FOR BUILDING INSPECTOR VERIFICATION BEFORE CONCRETE IS POURED. APPROVED
install 3 floor drains in heywood garage
Remove and replace shingled roof.
Replacing air handling units, VAV boxes, boilers, heat exchanger and pumps. Refer to attached drawings
2 window replacements w/no structure changes
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.