Saint Cloud, MN
Saint Cloud, MN
115
1
2
Furnace install (25-1009)
New Construction HVAC
11 kW residential solar system to be installed on roof
40 gallon gravity vent water heater install (25-953)
excavation spot repair of lateral sewer line
floor break spot repair lateral sewer line
Install main service entrance 200A breaker between Xcel meter and load center. Install PV system and necessary components: panels, rooftop wiring, rooftop junction boxes, drop-in, 8 space breaker panel, PV fused disconnect, production meter base w/100a infeed breaker, and associated wiring for supply-side feed.
Install rooftop solar arrays as approved by Xcel for interconnection. 19.44kW, 48x405W panels on Ironridge rafter-attached racking. New 50yr roof installed as of 10/8/25. Panel arrangement in plans is subject to minor modification.
Replace Boiler
excavation spot repair of lateral sewer line
remove existing gas log set and install a direct vent masonry insert
Rehook Furnace
Electrical for furnace and AC install
Install 4 new arc/gfci circuits to wiremold and repower 2nd floor which lost power somewhere in the wall on knob and tube.
REPLACE THE SERVICE
excavation spot repair of lateral sewer line
Electrical for furnace install
Wire the new furnace change out
Adapt gas line from existing water heater to new one.
NEW SERVICE AND RECONNECT AC AND FURNACE
replace water service line lsl
brick and framing repair due car hitting house replace damaged brick replace damaged wall sheathing replace insulation repairs wall framing as described in engineering report replace damaged wood foundation replace vapor barrier replace
Install EV charger in garage
Rtu change Green Mill
Installing foot wash station with two sensor wall spouts and one 4' trench drain.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.