Install main service entrance 200A breaker between Xcel meter and load center. Install PV system and necessary components: panels, rooftop wiring, rooftop junction boxes, drop-in, 8 space breaker panel, PV fused disconnect, production meter base w/100a infeed breaker, and associated wiring for supply-side feed.
Install rooftop solar arrays as approved by Xcel for interconnection. 19.44kW, 48x405W panels on Ironridge rafter-attached racking. New 50yr roof installed as of 10/8/25. Panel arrangement in plans is subject to minor modification.
NEW SERVICE AND RECONNECT AC AND FURNACE
Rtu change Green Mill
replacement softener