Minneapolis, MN
Minneapolis, MN
82
1
$11,000
2
(DMH - ProjectDox) RECONSTRUCT CONCRETE LANDING & STEPS AT FRONT ENTRY OF SFD. 2 NEW PIER FOOTINGS. Grippable handrail height 34-38 above nose of tread required at 4 or more risers. 7 3/4 maximum rise, 10 minimum tread allowed at stairs.
REPLACE GAS DRYER
replace 4 boilers
Replacing 5 windows, like for like.
Tear off existing siding and reside
REPLACE AC
Water heater replacement.
Replace 2 Mini-splits
Replace the existing AC
PATCH/REPAIR STUCCO AROUND NEW WINDOW AND DOOR IN AREA BETWEEN DECK RAILINGS AT EAST SIDE 2ND FLOOR DECK. occupancy: MIXED USE BLDG - R-3 AT 2ND FLOOR. 2020 MSBC
rough in only of hand sink and toilet in lower level.
Gas piping main, boiler and range
REPALCE FURNACE
TEMPORARY HEATER
INSTALL/ REPLACE DAIKIN FURNACE AND AIR CONDITIONER
(DMH - ProjectDox) COVERT APPROX 2,600 SF. WAREHOUSE SPACE AT EAST END OF BUILDING INTO NEW OPEN OFFICE WITH 2 SMALL CONFERENCE ROOMS, EMPLOYEE KITCHEN, NEW ADA SINGLE USER RESTROOM, AND SMALL 85 SF LOADING DOCK. REROOF FLAT ROOF AREA OVER EXISTING AT
HVAC system adding one 7.5 ton rooftop unit with gas heat and economizer, one exhaust fan, GRDs and all associated ductwork. Refer to attached drawings.
plumbing for back warehouse
furnace and a/c
INSTALL/ REPLACE DAIKIN AIR CONDITIONER
remove and replace 11 windows. Like for like, no structural changes
install bath fan on 2nd floor
ADD DORMER & GARAGE ----- ----- EXISITNG 2 BEDROOMS 1 BATH // ADD 2 BEDROOMS & 2 BATHS (1 EACH BASEMENT & 2ND FLOOR) ----- ADD GARAGE // 22' X 23' W 16' OH DOOR // BRACED WALL PANEL NAILING PER R602 REQUIRED ----- ADD EGRESS WINDOW AT WEST ELEVATION --
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.