Minneapolis, MN
Minneapolis, MN
34
5
$33,000
1
METER MOVE Q2 - 2025 BATCH #14
METER MOVE Q2 - 2025 BATCH #14
METER MOVE Q2 - 2025 BATCH #14
METER MOVE Q2 - 2025 BATCH #14
METER MOVE Q2 - 2025 BATCH #14
Tear off and replacement of garage roof.
2ND FLOOR BATHROOM REMODEL OF EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLANS). - INTERIOR DEMOLITION OF EXISTING BATHROOM TO ALLOW FOR NEW BATHROOM RENOVATION WORK. - REMODEL EXISTING BATHROOM AS NOTED ON FLOOR PLAN AS REQUIRED BY CODE. - U
New gas line house to garage, Range, Water heater
Replacement of Bryant Heat Pump
METER MOVE Q4 - 2024 BATCH #61
CONSTRUCT DETACHED _22_ BY _20__ WOOD FRAME GARAGE.(MAA) GARAGE RETAINING WALL CONDITIONS: YES / NO Construction Documents: ELECTRONIC (ProjectDox) Building Code: 2020 MN RESIDENTIAL CODE/MN RULES CH 1309 (2018 IRC) Energy Code: 2015 MN RESIDENTIA
WATER DEMAGE REPAIR (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. SMOKE ALARMS REQUIRED IN ACCORDA
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.