Minneapolis, MN
Minneapolis, MN
73
1
1
METER MOVE Q4 - 2025 BATCH #4
METER MOVE Q3 - 2025 BATCH #29
METER MOVE Q3 - 2025 BATCH #18
METER MOVE Q3 - 2025 BATCH #18
METER MOVE Q3 - 2025 BATCH #18
METER MOVE Q3 - 2025 BATCH #18
METER MOVE Q3 - 2025 BATCH #4
METER MOVE Q3 - 2025 BATCH #4
METER MOVE Q3 - 2025 BATCH #4
METER MOVE Q3 - 2025 BATCH #4
METER MOVE Q3 - 2025 BATCH #4
METER MOVE Q3 - 2025 BATCH #4
METER MOVE Q3 - 2025 BATCH #4
METER MOVE Q3 - 2025 BATCH #4
Installing a 3 head ductless mini split system
Remove and replace roof
Replace 9 windows within existing openings.
add bathroom on 2nd floor. Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. SMOKE ALARMS REQUIRED IN ACCORDANCE
Replacing Shower, Bathtub, Vanity, and Toilet along with water piping
Replace 5 windows within existing openings.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.