Shakopee, MN
Shakopee, MN
28
10
$6,189,527
Installation of new racking material. This is Phase 2 of this project. Phase 1 is covered under permit BLDC-033923-2026.
install 840' of 96" tall aluminum fence
Project Scope: Relocate existing racking to make room for future install. Means of egress to be maintained. No new racking will be installed.
Demo drops, add temp power drops, connect feeders; add breaker, cord drops, light fixtures
HVAC DUCTWORK ONLY.
Reface existing monument sign
4 Wall Signs (Channel letters and cabinet signs mounted to North side of building). - 164"x75.7" (86.21 sq. ft.) - 60"x160" (66.66 sq. ft.) - 60"x160" (66.66 sq. ft.) - 60"x160" (66.66 sq. ft.)
Installation of walk-in cooler and walk-in freezer. Condensing units location on top of box.
Hook up of one pre-piped CaptiveAire 16.0-gallon Tank fire suppression system into pre-piped kitchen hoods.
Provide addition to Siemens fire alarm system for main floor warehouse and 2nd floor office.
Installing fire suppression systems in rooms 162, 162B, 162c & 215
Kitchen remodel
Installing fire suppression systems in rooms 162, 162B, 162C & 215
Two-floor renovation of an existing office space and restrooms. With the addition of a kitchen for staff (by others). Light demolition includes Wall, ceiling, and floor finishes to be removed within office and restroom areas. Walls, ceilings, and floor finishes to be updated for the new tenants needs. MEP work is design-build and reworked per the new layout.
Commercial HVAC Remodel (please see highlighted areas on plans).
Gas Piping
Add/Relocate sprinkler heads (76) as needed for new walls and ceilings.
ADD/RELOCATE SPRINKLER HEADS (28) AS NEEDED FOR NEW WALLS AND CEILINGS.
New layout of interior walls and MEP systems to accommodate new tenant. Updated previously submitted permit valuation of $2040000.00 3/7