Minneapolis, MN
Minneapolis, MN
14
12
$89,311
Cap waste and water lines. Install new Lavatory faucet, and toilet. No rough ins or existing piping is being moved. If possible, I would like to have an inspection on the finish only. I have pictures of the piping that is in the wall, before and after I
(DMH-Pdox) BATHROOM REMODEL IN SFD. REPLACE FIXTURES IN SAME LOCATIONS. APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PROVIDED. APPLICANT IS REQUIRED TO PRINT COPIES OF ELECTRONIC APPROVED PLANS AND DOCUMENTS FROM PROJECTDO
Tub installation in 1st floor bath.
bathroom remodel. Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. SMOKE ALARMS REQUIRED IN ACCORDANCE WITH R31
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.