Saint Cloud, MN
Saint Cloud, MN
7
4
$1,185,975
22-270 VIKING COKE 480 PANEL - REPLACE 480 SWITCHBOARD WITH NEW, NO NEW CIRCUITS.
22-268 VIKING COKE SILO BUILDING - PANEL, LIGHTS AND OUTLETS
Addition of steel structure on north side to enclose tanks. Fire suppression, plumbing, electrical and HVAC is contracted by owner
Partial reroof of warehouse. Removal of existing EPDM membrane and EPS insulation down to the old BUR roof system. Remove old BUR roof system and leave existing insulation in place. Add one layer of 3" EPS insulation to bring to code. Install a Carlisle 60 MIL EPMD ballast single ply roof system. Install required Carlisle roof accessories and flashings. Install new sheet metal as required.
Install new footings, foundation and concrete slab for new syrup tanks on north side of building. Slab dimensions are 17' x
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.