Mechanical (HVAC System, ductwork, & distribution) - 2-Story building with completed office, loading dock, break room, toilet and passenger elevator on first floor. Second floor will be completed shell with lights, HVAC and sprinkler (Mayo - NW Warehouse) See Footings/Foundation permit #R11-248CB
Electrical - 2-Story building with completed office, loading dock, break room, toilet and passenger elevator on first floor. Second floor will be completed shell with lights, HVAC and sprinkler (Mayo - NW Warehouse) See Footings/Foundation permit #R11-248CB PO 602269-12-910-E
Plumbing - 2-Story building with completed office, loading dock, break room, toilet and passenger elevator on first floor. Second floor will be completed shell with lights, HVAC and sprinkler (Mayo - NW Warehouse) See Footings/Foundation permit #R11-248CB
Grading for 2-Story building with completed office, loading dock, break room, toilet and passenger elevator on first floor. Second floor will be completed shell with lights, HVAC and sprinkler (Mayo - NW Warehouse)
Mechanical (installation of ductwork for supply air, bathroom fan, air transfer for returns) - Put up four walls to make office, storage area, and work area (A to Z Embroidery)
A to Z Embroidery tenant finish Suite 13 (Plaza 14 West)
Plumbing - install one (1) 1" RPZ backflow preventer ROCHESTER ICF
Plumbing (finishing off a bthroom and adding a laundry sink) - Put up four walls to make office, storage area, and work area (A to Z Embroidery)
Electrical - Put up four walls to make office, storage area, and work area (A to Z Embroidery)
Footing and Foundation for 2-Story building with completed office, loading dock, break room, toilet and passenger elevator on first floor. Second floor will be completed shell with lights, HVAC and sprinkler (Mayo - NW Warehouse)
Mechanical (Ductwork) - Wall removal and interior alterations - New Tenant Finish (Tru-Tain at Plaza 14)
Wall removal and interior alterations - New Tenant Finish (Tru-Tain at Plaza 14)
Plumbing (finish bath) - Wall removal and interior alterations - New Tenant Finish (Tru-Tain at Plaza 14)
Electrical - Wall removal and interior alterations - New Tenant Finish (Tru-Tain at Plaza 14)
Plumbign (rough in DWV for 8' x 4" trench drain and single compartment sink. Rough in water lines for single compartment sink. Rough in two (2) 6-gal electric water heaters) - Tenant Finish (Post Town Winery)
Mechanical - Tenant Finish (Post Town Winery)
Electrical (white box finish) -Tenant Finish (Post Town Winery)
Fitup project for an inner tenant space of the existing whitebox building Unit #8 (The Printers- Plaza 14)
Mechanical (Ductwork modifications) - Fitup project for an inner tenant space of the existing whitebox building Unit #8 (The Printers- Plaza 14)
Electrical (General lighting/outlets 220V 20A circuit for copier - Data & PH) - Fitup project for an inner tenant space of the existing whitebox building Unit #8 (The Printers- Plaza 14)
Fitup project for an inner tenant space of the existing whitebox building Unit #7 (The Printers- Plaza 14)
Plumbing (install fixtures) - Fitup project for an inner tenant space of the existing building (The Printers)
Mechanical (add ductwork supplies and returns and installing standard bath fan) - Fitup project for an inner tenant space of the existing building (The Printers)
Electrial (build out - 1-3-phase 208V 20 A circuit, 4 - 208 Volt & 20A circuits, 2 - 120V 20 circuits general & task lighting, bathroom finish) - Fitup project for an inner tenant space of the existing building (The Printers)
Mechanical - furnace replacement
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.