Rochester, MN
Rochester, MN
278
6
$65,490
Gas Piping for Single Family Dwelling, 2 Story w/ Unfinshed Basement, Covered Patio and 3 Stall Attached Garage.
SFD 1 FP, attached 3 car garage, covered patio. Unfinished lower level.
Mechanical - furnace replacement
Electrical (Temperature Controls) - Relocation of Print shop & Mail room (Mayo - Technology warehouse - 7R120390)
Relocation of Print shop & Mail room (Mayo - Technology warehouse - 7R120390)
Mechanical (RTU, fans, ductwork) - elocation of Print shop & Mail room (Mayo - Technology warehouse - 7R120390)
Plumbing - Relocation of Print shop & Mail room (Mayo - Technology warehouse - 7R120390)
Hydronic - Relocation of Print shop & Mail room (Mayo - Technology warehouse - 7R120390)
Gas Piping for Relocation of Print shop & Mail room (Mayo - Technology warehouse - 7R120390)
Electrical for Relocation of Print shop & Mail room (Mayo - Technology warehouse - 7R120390)
Replace 50 gallon gas powervent water heater
Plumbing - water heater replacement
Mechanical - vent unit heater to code - installed by homeowner
Existing tenant adding a brewery (Plaza 14 West - Athelon Brewery - Suite 10)
Mechanical (add hood and fan) - Existing tenant adding a brewery (Plaza 14 West - Athelon Brewery - Suite 10)
Electrical - Existing tenant adding a brewery (Plaza 14 West - Athelon Brewery - Suite 10)
Mechanical (bath fan, heat run and return air) - PARTIAL Basement Finish - (1) bedroom, family room, hall, & bathroom (no fireplace(s)
Plumbing - PARTIAL Basement Finish - (1) bedroom, family room, hall, & bathroom (no fireplace(s)
Electrical - PARTIAL Basement Finish - (1) bedroom, family room, hall, & bathroom (no fireplace(s)
New 16 x 14 Deck w/stairs | Deck Addition
PARTIAL Basement Finish - (1) bedroom, family room, hall, & bathroom (no fireplace(s) | Basement Finish
Mechanical - furnace and a/c replacement
Gas Piping (to rooftop units) - 2-Story building with one completed office, loading dock, break room, toilet and passenger elevator on first floor. Second floor will be completed storage with lights, HVAC and sprinkler (Mayo - NW Warehouse) See Footings/Foundation permit #R11-248CB
Plumbing (added roof drains and rain water leader to project) - 2-Story building with one completed office, loading dock, break room, toilet and passenger elevator on first floor. Second floor will be completed storage with lights, HVAC and sprinkler (Mayo - NW Warehouse) See Footings/Foundation permit #R11-248CB
2-Story building with one completed office, loading dock, break room, toilet and passenger elevator on first floor. Second floor will be completed storage with lights, HVAC and sprinkler (Mayo - NW Warehouse) See Footings/Foundation permit #R11-248CB
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.