New Airplane Hangar 200 1phase Service General Power and Lighting
4301 12 ST SE, Saint Cloud
install infloor heating system, with 2 wall hung boilers.
4301 12 ST SE, Saint Cloud
Build new single story 11,200 sq. ft. pre-engineered metal airplane hangar building. New building to consist of airplane hangar, vestibule, waiting area, 2 offices, restroom, furnace room and mechanical room.
4301 12 ST SE, Saint Cloud
Install furnace, ac, sidewall fan and louvers, diffusers, ductwork, 24' high volume fan. El-Jay will be installing in-floor heat throughout the entire building which is not on the plan. Total for the project is $302000.00
4301 12 ST SE, Saint Cloud
This permit serves as an approval to construct footings and foundation up to grade only. This is not an approval and should not be considered as an approval for the building as a whole, including architectural, plumbing, HVAC, and electrical. Permit holder of this permit is liable for any changes to footing/foundation if needed to meet approval of full building permit. An additional building permit (CBLD25-0046) will not be issued to continue construction above grade until plan review has been completed and approved by the City of St. Cloud Building Safety Department.
4301 12 ST SE, Saint Cloud
new hangar, trench drains, 2 bathrooms, breakroom, flammable tank
56304 4301 12 ST SE, Saint Cloud
Include installation of sanitary sewer, 6” fire line / domestic waterline, and storm sewer as shown. Assume utilities are stubbed into lot. Utility contractor to coordinate install of water main and sanitary sewer with plumbing contractor. Utilities to be brought within 5’ of the building by utility contractor. 2. Include investigative jetting/cleaning and camera services of sanitary lines
4301 12 ST SE, Saint Cloud
Build new two story 15,000 sq. ft. airplane hangar building. New building to consist of hangar, conference room, lobby, vestibule, office, restroom, custodian rm, mech/elec room, and maintenance room on first floor. Second floor will be for storage.