Saint Paul, MN
Saint Paul, MN
57
17
$3,700,150
Tenant improvement remodel of shower rooms on 2nd floor
In Mens and Womens locker room replace the existing grid with new. Like for Like
Furnish and install new in same locations: 7 - lavs 2 - salvaged water coolers We will reinstall with new in new locations: 8 - shower faucets
Run circuits for modernization of elevators B1, B2, C1, and A3
Remodel of the locker room shower area at the LEC
Replace (1) VAV
Removal of existing metal railing and installation of maximum-security barrier system with associated attachments to existing structure. New metal handrail at existing stair. Partial removal of existing ceiling as required for installation of maximum barrier system. Ceiling and metal railing paint.
P1886H6F Modernization
P1885H6F Modernization
P1881H3F Modernization
P1882H4F Modernization
P1930H3F Modernization
P1887H6F Modernization