REPLACE BOILER
(DMH - PDox) RECONSTRUCT 6'x6' CONCRETE LANDING & STEPS AT FRONT OF SFD OVER NEW CMU FOUNDATION. AN INSPECTION IS REQUIRED BEFORE CONCRETE IS POURED TO VERIFY FOOTINGS AND FROST DEPTH. Grippable handrail per IRC 311.7.8.5 and 34-38 height above
Install 2.5-ton heat pump with 3-highwall units
(DMH-ProjectDox) REMOVE & REPLACE STUCCO EXTERIOR TO SFD. REPLACE ALL WINDOWS IN SAME LOCATION. ROT REPLACEMENT. TEMPERED GLASS SHALL BE INSTALLED AT HAZARDOUS LOCATIONS PER 2020 IRC R308. 2- Layer Grade D paper, or equivalent meeting ASTM D-779